Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Engineering Services
  5. ›SE Eastgate Way Sidewalk

City of Bellevue·Washington

SE Eastgate Way Sidewalk

Closes 10/8/2026$350k – $1.2MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bellevue is seeking a qualified consulting firm to provide civil, structural, geotechnical and environmental engineering design services for the SE Eastgate Way Sidewalk project. The consultant will develop preliminary, 30%, 60%, 90% and final design plans, specifications and cost estimates, conduct environmental studies and permitting, and support construction. The contract is a negotiated hourly‑rate professional services agreement expected to begin in February 2027 and run for approximately two years, with an option to extend. The scope includes sidewalk construction, curb‑and‑gutter, planter strip, retaining wall, storm‑drainage, water‑quality treatment, landscaping, erosion control, and related mitigation. The City requires a licensed Professional Engineer as Project Manager, demonstrated experience on similar magnitude projects, and compliance with federal, state and local regulations, including SBE participation planning. Submissions are due electronically by 2:00 PM on October 8, 2026. • Design of sidewalk, curb‑and‑gutter, planter strip, retaining wall, and associated utilities • Preparation of 30%, 60%, 90% and final design plans, specifications, and PS&E cost estimates • Environmental documentation (ESA, NEPA/SEPA) and permitting • Geotechnical, structural, and storm‑water design, including natural drainage practices • Design support during construction and coordination with WSDOT LAG Manual standards • Minimum 2‑year contract, start Feb 2027, optional extensions • Required PE‑licensed Project Manager, SBE participation plan, and familiarity with federal grant requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Dang(Bid Contact)

[email protected]

(425) 452-4870

Key dates

Opened
9/10/2026
Questions due
9/24/2026
Closes
10/8/2026
Projected award
10/23/2026
Duration
2 years

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
26095

Budget estimate

$350,000 – $1,200,000

The solicitation notes that the final professional‑services contract “approaching or exceeding $350,000” must be presented to City Council for approval. Considering the two‑year duration, hourly‑rate negotiation, and the extensive scope (pre‑design through construction support, environmental permitting, and multiple design phases), a realistic total contract value is likely in the range of $350,000 to $1.2 million. Lower‑end estimates assume modest hourly rates and limited change‑order work; higher‑end estimates account for higher‑skill specialist rates, extensive environmental documentation, and potential extensions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Sandy Springs·Georgia

Top match · 63%

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Charlotte·North Carolina

63% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Harrisonburg·Virginia

62% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Richland County·South Carolina

61% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

Carroll County·Maryland

60% match

Eldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/22/2026

Connecticut Town of Voluntown·Connecticut

60% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

North Carolina Town of Knightdale·North Carolina

59% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Connecticut Town of Hamden·Connecticut

59% match

Hamden Walkable Sidewalks DOT 61-153

Closes 12/10/2026Opened 10/27/2026

City of Sunnyvale Procurement Bids and RFPs·California

59% match

Install Sidewalk on Poplar Avenue

Closes 11/18/2026Opened 10/23/2026

Connecticut Town of Hamden·Connecticut

59% match

Hamden Walkable Sidewalks DOT 61-153

Closes 12/10/2026Opened 10/27/2026

San Bernardino County·California

59% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Maryland Carroll County Government - Procurement·Maryland

59% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

City of Richmond Government·Virginia

58% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Alma·Arkansas

58% match

Alma Southside Sidewalk Improvements

Closes 11/10/2026Opened 10/18/2026

City of Fayetteville·North Carolina

58% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

Central Midlands Council of Governments·South Carolina

58% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

County of DeKalb, GA·Georgia

58% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Charlotte·North Carolina

58% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

SC Department of Education·South Carolina

58% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026

Charleston County·South Carolina

58% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

Missouri Department of Transportation·Missouri

58% match

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

Texas City of San Antonio·Texas

57% match

Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 11/6/2026Opened 9/30/2026

Connecticut Town of Plainfield·Connecticut

57% match

Sidewalk Repair for the Recreation Department & Senior Center Building

Closes 11/4/2026Opened 9/26/2026

City of Seattle·Washington

57% match

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026Opened 10/14/2026

City of Riverside·California

57% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026