Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›STL District, City of Washington, two-inch asphalt…

Missouri Department of Transportation·Missouri

STL District, City of Washington, two-inch asphalt resurfacing with full width cold mill, removal and replacement of all sidewalks and curb and gutter to meet ADA regulations from Front Street to Fifth with retaining wall where necessary

Closes 3/24/2026$500k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Washington is seeking a qualified contractor to perform comprehensive roadway upgrades on High Street, including a full‑width cold mill, a two‑inch asphalt overlay, complete sidewalk and curb‑gutter replacement to meet ADA standards, installation of retaining walls where required, signage, striping, paved approaches, and ADA‑compliant curb ramps. The contract will be awarded to the lowest responsive and responsible bidder, must comply with MoDOT qualified‑contractor requirements, prevailing‑wage rules, and mandatory OSHA ten‑hour safety training. No second‑tier subcontracting is allowed, and a 5 % bid security is required. • Two‑inch asphalt resurfacing after full‑width cold milling of existing pavement. • Removal and replacement of all sidewalks, curbs, and gutters from Front Street to Fifth Street to meet ADA regulations. • Installation of retaining walls, signage, striping, paved approaches, and ADA‑compliant curb ramps. • Mandatory compliance with MoDOT Qualified Contractor List, prevailing‑wage laws, and OSHA safety training; no second‑tier subcontractors permitted.

Attached files

Contact

Sherri Klekamp(City Clerk)

[email protected]

(636) 390-1006

Key dates

Opened
2/23/2026
Closes
3/24/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237320

Budget estimate

$500,000 – $1,200,000

The solicitation does not disclose a contract value. Based on comparable municipal roadway resurfacing projects of similar scope (2‑inch overlay, full‑width milling, ADA sidewalk upgrades, retaining walls, and related work) in small‑to‑medium cities, the total contract is likely to fall between $500,000 and $1,200,000. Factors influencing the range include length of the street segment, depth of milling, volume of asphalt, extent of retaining wall work, and prevailing‑wage labor rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 75%

STL District, City of St. Louis, Removal and Replacement of Southwest and Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Miami-Dade County Department of Transportation and Public Works·Florida

74% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Seattle·Washington

73% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

73% match

STL District, City of Frontenac, Removals, clearing and grubbing, grading, excavation, bridge construction, asphalt pavement, pedestrian decorative fence, etc.

Closes 11/2/2026Opened 9/14/2026

City of Fargo·North Dakota

72% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Missouri Department of Transportation·Missouri

72% match

St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant Road

Closes 11/18/2026Opened 10/13/2026

Missouri Department of Transportation·Missouri

72% match

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

Missouri Department of Transportation·Missouri

72% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

City of Broken Arrow·Oklahoma

71% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

City of Waco·Texas

71% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

Idaho Transportation Department·Idaho

71% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Seattle·Washington

71% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Vernon·California

71% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Ormond Beach - Purchasing Office·Florida

71% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

U.S. Department Of Defense·Missouri

71% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Maryland State Highway Administration·Maryland

71% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Indianapolis·Indiana

71% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Pasadena·California

71% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

Pocatello·Idaho

70% match

2026 Old Town Sidewalk Removal and Replacement Project Round 2

Closes 11/20/2026Opened 10/20/2026

City of Fairfield·Ohio

70% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Fort Wayne·Indiana

70% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Stillwater·Oklahoma

70% match

Full Depth Repair - 27TR06

Closes 11/18/2026Opened 10/17/2026

U.S. Department Of Transportation·Washington

70% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

City of St. Louis Board of Public Service·Missouri

70% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of St. Michael·Minnesota

70% match

39th Street Lift Station & Forcemain Decommission Project

Closes 11/3/2026Opened 10/16/2026