Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›S 48th St Seismic Bridge Retrofit

Tacoma·Washington

S 48th St Seismic Bridge Retrofit

Closes 10/13/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Tacoma is soliciting bids for the design‑build of the East Lincoln Avenue Bridge replacement project. The contract will encompass demolition of the existing structure, site preparation, utility coordination, structural steel fabrication, concrete work, roadway and pedestrian improvements, and final inspection to meet city standards. This is a traditional public‑sector construction procurement that requires a firm‑wide capability in bridge construction, heavy civil engineering, and compliance with local, state, and federal regulations. • Scope includes full bridge replacement (sub‑structure and super‑structure) with associated roadway and pedestrian amenities. • Requires coordination with city utilities, traffic management plans, and adherence to Washington State Department of Transportation (WSDOT) specifications. • Contractor must provide all labor, equipment, materials, and safety plans, and must secure necessary permits and insurance. • Bid submission deadline is 10/13/2026 at 11 AM Pacific; all bid packages must be obtained through ARC Tacoma’s planroom.

Attached files

Contact

[email protected]

(800) 337-8103

Key dates

Opened
9/8/2026
Closes
10/13/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PW25-0243F

Budget estimate

$1,000,000 – $3,000,000

No contract value is disclosed in the provided documents. Based on typical medium‑size municipal bridge replacements in Washington State, the project could range from $1 million for a modest two‑lane bridge to $3 million for a larger, more complex structure with extensive roadway and pedestrian improvements. Factors influencing the estimate include bridge span length, material choices (steel vs. concrete), utility relocation needs, and local labor rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Pulaski·Virginia

Top match · 66%

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Massachusetts Department of Transportation·Massachusetts

65% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Connecticut Dept. of Transportation·Connecticut

64% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

City of Prior Lake·Minnesota

64% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026

Arkansas

64% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

Connecticut Dept. of Transportation·Connecticut

64% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

64% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Illinois THA - Toll Highway Authority·Illinois

64% match

I-21-4736 - CO #27 - ATP #32.2 - I-490 Railroad Bridge Construction

Closes 11/5/2026Opened 10/13/2026

California Department of Transportation·California

64% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

64% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026

Washington DC Transportation (DDOT)·District of Columbia

63% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

Connecticut Dept. of Transportation·Connecticut

63% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Benewah County·Idaho

63% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Connecticut Dept. of Transportation·Connecticut

63% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Illinois Tollway·Illinois

63% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

63% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Meriden·Connecticut

63% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Indianapolis·Indiana

63% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

City of St. Louis·Missouri

63% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Indianapolis·Indiana

63% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Roanoke City Government·Virginia

62% match

SOL1342, Wiley Drive Low Water Bridge Replacement

Closes 11/4/2026Opened 9/23/2026