Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Engineering Services
  5. ›Dupont Wappoo Watershed Improvements Plan

Charleston·South Carolina

Dupont Wappoo Watershed Improvements Plan

Closes 10/9/2026$275k – $575kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Charleston is soliciting an engineering firm to provide Phase One conceptual design and planning services for the Dupont Wappoo Watershed Improvements Project, a 1,600‑acre flood‑mitigation effort in West Ashley. The consultant will develop existing‑conditions assessments, hydrologic/hydraulic models, evaluate improvement alternatives, coordinate regulatory permitting, estimate costs, and produce a Phase One Design Package for handoff to the U.S. Army Corps of Engineers. The scope is limited to conceptual engineering; detailed design, permitting, and construction documents are reserved for Phase Two. • Develop preliminary site assessments, limited topographic survey, and field investigations. • Perform conceptual hydrologic & hydraulic modeling (StormWise) and evaluate flood‑reduction alternatives. • Review regulatory, permitting, property, easement, and environmental constraints; begin coordination with USACE, FEMA, SCDES, SCDOT, etc. • Produce cost‑estimate ranges, phasing recommendations, and a comprehensive Phase One Design Package (reports, models, GIS/CAD files, exhibits). • Participate in a handoff meeting with City and USACE; conduct bi‑weekly progress meetings and public outreach. • Must meet City Small Business Enterprise (SBE) goals; submission deadline 10 Sept 2026 – 9 Oct 2026.

Attached files

Contact

Jordyn Mallett(Stormwater Engineering Project Manager II)

[email protected]

(843) 579-6419

Key dates

Opened
9/15/2026
Questions due
9/28/2026
Closes
10/9/2026
Duration
6 months

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330

Budget estimate

$275,000 – $575,000

The solicitation does not disclose a fee. Phase One conceptual design for a 1,600‑acre watershed typically requires a senior engineering team for roughly 6 months. Assuming an average loaded rate of $150–$250 per hour for senior engineers and $100–$150 for supporting staff, total labor costs range from $250,000 to $500,000. Additional expenses (travel, sub‑consultants, software licenses, public outreach) could add 10‑15 % more. Therefore a reasonable estimate for the contract value is between $275k and $575k, with the low‑end reflecting a lean staffing model and the high‑end covering extensive modeling, stakeholder outreach, and detailed documentation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Douglas·Wyoming

Top match · 69%

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Douglas·Wyoming

68% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

California Grants·California

66% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

U.S. Bureau of Reclamation·United States of America

66% match

WaterSMART Cooperative Watershed Management Program

Closes 2/15/2028Opened 6/10/2026

City of Charlotte·North Carolina

65% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

California Grants·California

65% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

U.S. Department Of The Interior·Utah

65% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

South Tahoe Public Utility District·California

65% match

Engineering Services for Water System and Sewer Collection System Strategic Plans

Closes 12/11/2026Opened 10/27/2026

U.S. Department Of The Interior·Colorado

64% match

Y--EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/25/2026

Environmental Conservation, NYS Department of·New York

64% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

Idaho Transportation Department·Idaho

64% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Town of Cutler Bay·Florida

64% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

El Dorado Irrigation District·California

64% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

City of Casper·Wyoming

64% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Chittenden County Regional Planning Commission·Vermont

64% match

Ongoing Call: Water Quality Improvement Project Subcontractors

Closes 12/31/2026Opened 12/19/2023

City of Lebanon·Indiana

64% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026