Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Macon-Fower Memorial Airport (K89) - Obstruction Removal

City of Macon·Missouri

Macon-Fower Memorial Airport (K89) - Obstruction Removal

Closes 5/12/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the removal of obstructing structures at Macon‑Fower Memorial Airport (K89). The contractor will be responsible for full site preparation, demolition of existing buildings and pavement, erosion control, excavation, grading, and subsequent site restoration work including seeding, topsoil placement, and mulching. The work must be performed in accordance with the City of Macon’s specifications and under the oversight of Alfred Benesch & Company. • Site preparation, mobilization, and erosion control measures • Demolition of existing buildings, pavement, and related structures • Excavation, embankment, clearing, grubbing, and site grading • Seeding, topsoil placement, mulching, and final site restoration • All labor, materials, equipment, and compliance with local codes required for obstruction removal at a municipal airport

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Elizabeth Duvall(Project Manager)

[email protected]

(913) 213‑5931

Key dates

Opened
4/21/2026
Closes
5/12/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
1326-700019.01

Budget estimate

$200,000 – $500,000

No contract value is disclosed. Based on typical municipal airport obstruction removal projects of this scale—covering demolition, earthwork, and landscaping—the total contract cost is likely in the low‑to‑mid six‑figure range (approximately $200k‑$500k). Factors influencing the final figure include the size and number of obstructions, site access constraints, and local labor/material rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia Turner County Board of Commissioners·Georgia

Top match · 71%

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

70% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

70% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

Mercer County·New Jersey

70% match

Advertising Concession for the Trenton-Mercer Airport

Closes 11/17/2026Opened 4/16/2024

City of Charlotte·North Carolina

69% match

Tree Obstruction Remediation

Rolling / TBD closeOpened 8/11/2026

Panola County Board of Supervisors·Mississippi

69% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

Memphis-Shelby Airport Authority·Tennessee

68% match

DeWitt Spain Exterior Improvements

Closes 11/23/2026Opened 10/6/2026

City of Lynchburg·Virginia

68% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

Niagara Frontier Transit Authority (NFTA)·New York

68% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

City of Lynchburg·Virginia

68% match

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City of Mankato·Kansas

68% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Georgia Savannah Airport Commission·Georgia

68% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

Georgia Savannah Airport Commission·Georgia

68% match

SAC 30660 Runway 10 Tree Clearing

Closes 11/10/2026Opened 10/9/2026

NYS Niagara Frontier Transportation Authority·New York

68% match

NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/5/2026

CHA Consulting, Inc.·Indiana

67% match

EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL AIRPORT – FLIGHTLINE DRIVE UTILITY EXTENSION

Closes 12/2/2026Opened 10/29/2026

Port of Portland·Oregon

67% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

County of Okaloosa·Florida

67% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Raleigh Durham Airport Authority·North Carolina

67% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Delta Airport Consultants·Virginia

67% match

COMING SOON - Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 (20030)

Rolling / TBD closeOpened 5/1/2026