Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Construction
  5. ›Invitation to Bid Woodford and Myrtle water main replacement

City of Missoula·Montana

Invitation to Bid Woodford and Myrtle water main replacement

Closes 12/11/2025$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Missoula is inviting bids for the construction of Woodford and Myrtle Water Main Replacements Phase 1. The project involves installing approximately 2054 LF of 8-inch Class 350 DIP in Woodford Street and Myrtle Street from Florence to South 4th Street West in Missoula, MT. Connections will be made to existing water mains and fire hydrants will be installed. The existing water services will be swapped and connected to the new mains. Associated appurtenances, fittings, and other items necessary to complete the project are detailed on the construction plans. All restoration of disturbed areas including asphalt, concrete, gravel, landscaping, and irrigation, and other miscellaneous work are included. • The complete Invitation to Bid, Contract Documents consisting of half-size Drawings, and Project Manual may be viewed or obtained on-line beginning on November 22, 2025. • Prospective Bidders must purchase contract documents through QuestCDN. • A mandatory virtual Pre-Bid Conference will be held virtually via Microsoft Teams at 2:00 p.m., local time (MT), on Tuesday, December 2, 2025. • The City of Missoula is an Equal Opportunity Employer and requires the Contractor(s) to be an Equal Opportunity Employer and comply with the City’s Equal Opportunity Policy.

Attached files

Contact

Cory Davis or Andrew Mill

[email protected] / [email protected]

(309) 644-4427

Key dates

Opened
11/25/2025
Pre-bid meeting
12/2/2025Mandatory
Closes
12/11/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
791

Budget estimate

$500,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes installing 2054 LF of 8-inch Class 350 DIP, connections to existing water mains, fire hydrants, and restoration of disturbed areas. The cost of materials, labor, and equipment will influence the likely payment range. Assuming an average cost of $100 per linear foot for water main installation, the total cost would be around $205,400. Adding costs for connections, fire hydrants, and restoration, the total budget could be in the range of $500,000 to $1,500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Western Virginia Water Authority·Virginia

Top match · 80%

INVITATION TO BID: WYCLIFFE AVE WATERLINE REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

Western Virginia Water Authority·Virginia

78% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Western Virginia Water Authority·Virginia

78% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Western Virginia Water Authority·Virginia

77% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Georgia Gwinnett County·Georgia

77% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Gwinnett County Government·Georgia

75% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Town of Smithtown·New York

75% match

Water Main Oakside & Landing

Closes 12/3/2026Opened 10/23/2026

Gwinnett County Government·Georgia

75% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

City of Holly Grove·Arkansas

75% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of Charlotte·North Carolina

75% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Goodwyn Mills Cawood·Georgia

75% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Oregon Tualatin Valley Water District·Oregon

75% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Arkansas

74% match

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

City of Waynesboro·Virginia

74% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Anderson, SC·South Carolina

74% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

City of Asheville·North Carolina

74% match

Request for Formal Bids for Water Line Repair for Wood Ave and Misc. Insulation Replacement (Federally Funded)

Closes 11/5/2026Opened 10/1/2026

Georgia City of Cartersville·Georgia

74% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Grand Rapids Department of Engineering·Michigan

74% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

Northern Kentucky Water District·Kentucky

74% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Wythe County·Virginia

74% match

Wythe County, VA RFP - Dunford Road Water Improvements

Closes 11/10/2026Opened 10/14/2026

City of Edgewater, FL·Florida

73% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Goodwyn Mills Cawood·Alabama

73% match

Geno Road Water Main Replacement for the Orange Beach Water Authority

Closes 11/19/2026Opened 10/20/2026

Massachusetts Town of Plymouth·Massachusetts

73% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Agriculture·Utah

73% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

City of Helena·Montana

73% match

Request for Bid Walnut Street-Airport Road Water Main Replacement Proj

Rolling / TBD closeOpened 5/19/2026