Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›ADVANCED WATER PURIFICATION PROGRAM - TRES RIOS

City of Tucson·Arizona

ADVANCED WATER PURIFICATION PROGRAM - TRES RIOS

Closes 12/17/2025$80M – $90MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Tucson is seeking a design-build firm to design and construct an Advanced Water Purification Facility (AWPF) capable of producing 2.5 million gallons per day (MGD) of potable water. The facility will be located on a portion of land owned by Pima County, immediately southeast of the Tres Rios Water Reclamation Facility. The project aims to improve water quality, water supply reliability, and provide long-term conservation benefits for the local community and the Colorado River system. The design-build firm will be responsible for designing and constructing the AWPF, including all associated water infrastructure, and collaborating with the operator for a seamless transition to long-term operations and maintenance. • The project includes designing and constructing an AWPF capable of producing 2.5 MGD of potable water • Integrating the facility with the Tres Rios WRF and the City's reclaimed system • Achieving substantial completion and final completion of the project by June 1, 2031 • Ensuring efficient use of provided Bureau of Reclamation funding • Collaborating with the operator for a seamless transition to long-term operations and maintenance

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kristen Amante(Contract Officer)

[email protected]

(520) 667-6816

Key dates

Opened
10/15/2025
Questions due
12/3/2025
Pre-bid meeting
11/3/2025
Closes
12/17/2025
Duration
72 months

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
237110
Solicitation №
260120

Budget estimate

$80,000,000 – $90,000,000

Based on the estimated cost for the project, which is $86,700,000, the budget for the design-build firm can be expected to be around this amount, considering the scope of work and the requirements of the project. However, the actual budget may vary depending on the final contract terms and the firm's performance.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Eastern Municipal Water District·California

Top match · 70%

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Ontario·California

69% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

California Grants·California

67% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

California Grants·California

66% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

California Grants·California

65% match

Proposition 4 – River

Rolling / TBD closeOpened 6/11/2025

Riverside Transit Agency·California

65% match

Deionized Water Services

Closes 11/19/2026Opened 10/29/2026

California Grants·California

64% match

Clean Water State Revolving Fund (CWSRF) Program

Rolling / TBD closeOpened 3/5/2025

California Grants·California

64% match

Proposition 68 Technical Assistance

Rolling / TBD closeOpened 9/5/2024

California Grants·California

64% match

Emergency Drinking Water / Cleanup & Abatement Account Programs

Rolling / TBD closeOpened 8/13/2024

U.S. Bureau of Reclamation·United States of America

64% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

California Grants·California

64% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

U.S. Department Of Health And Human Services·Arizona

64% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

64% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

City of Columbus·Ohio

64% match

Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

Citrus County - Board of County Commissioners·Florida

64% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

El Paso Water·Texas

64% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Riverside·California

64% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

California Grants·California

63% match

Drinking Water State Revolving Fund (DWSRF) Planning

Rolling / TBD closeOpened 8/1/2022

Colorado Department of Natural Resources (Division of Colorado Water Conservation Board)·Colorado

63% match

Colorado Water Reuse Progress Report and Roadmap

Closes 11/30/2026Opened 10/27/2026

California Grants·California

63% match

Proposition 4 Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024

Rolling / TBD closeOpened 4/13/2026

U.S. Rural Utilities Service·United States of America

63% match

Technical Assistance and Training Grant Program

Rolling / TBD closeOpened 10/1/2026

El Paso Water·Texas

63% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

California Grants·California

63% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

U.S. Bureau of Reclamation·United States of America

63% match

Native American Affairs: Fiscal Year 2025 Colorado River Basin Tribal Drought Resiliency Program

Closes 11/20/2026Opened 6/2/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

63% match

Water Heaters for Torres Unit

Closes 11/5/2026Opened 10/21/2026