Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›Professional Engineering Design Services for WMP Project…

City of Irving·Texas

Professional Engineering Design Services for WMP Project #4 24-inch Water Pipeline along State Highway 183 Section 1

Closes 6/16/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Irving Capital Improvements Department is seeking qualified professionals to provide Engineering Design Services for the installation of a 24-inch Water Supply Line along State Highway 183. The project involves the design and installation of the water pipeline, and the selected firm will be responsible for providing all necessary engineering services. The City is looking for firms with experience in water pipeline design and construction, and the ability to work collaboratively with the City's staff. The selection process will be based on the firm's qualifications, experience, and ability to meet the City's requirements. • The project involves the installation of a 24-inch Water Supply Line along State Highway 183. • The selected firm will be responsible for providing all necessary engineering services. • The City is looking for firms with experience in water pipeline design and construction. • The selection process will be based on the firm's qualifications, experience, and ability to meet the City's requirements. • The project may require geotechnical engineering services, which will be provided by the selected design firm.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Darlene Humphries(Purchasing Manager)

[email protected]

(972) 721-3752

Key dates

Opened
5/19/2026
Questions due
6/3/2026
Closes
6/16/2026

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
102D-26F Addendum 1

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be in the range of $500,000 to $2 million, based on the scope of the project and the services required. The project involves the design and installation of a 24-inch Water Supply Line, which is a significant infrastructure project. The cost of the project will depend on the complexity of the design, the materials required, and the labor costs. The City of Irving may have a budget for the project, but it is not specified in the document.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of El Paso De Robles·California

Top match · 77%

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

City of Farmers Branch·Texas

77% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

Maryland Washington Suburban Sanitary Commission·Maryland

76% match

Water Engineering Services

Closes 11/18/2026Opened 10/17/2026

City of Redlands·California

76% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

76% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

County of Moore·North Carolina

75% match

Engineering Services - East Moore Water District Phase 5 Water Main Extension

Closes 11/12/2026Opened 10/22/2026

Lansing Board of Water & Light·Michigan

75% match

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations (Dunlap, Astor, Berry, Palmer, Tenny

Closes 11/24/2026Opened 10/23/2026

The Metropolitan Water District of Southern California·California

75% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Cortez·Colorado

75% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

City of Conway·South Carolina

75% match

HWY 905 Water Line Upgrade - RFP

Closes 12/3/2026Opened 10/30/2026

City of Riverside·California

74% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Butler County·Ohio

74% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

City of Waukegan·Illinois

74% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

Village of Cary·Illinois

74% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

City of Columbus Ohio·Ohio

74% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

CPPJ- Special Service Districts·Louisiana

74% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

Village of Wilmette·Illinois

74% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

Pierce County·Washington

74% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

Goodwyn Mills Cawood·Georgia

74% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

NYS Dutchess County Water and Wastewater Authority·New York

74% match

Quaker Hill-Hyde Park Interconnect-Water Main & Pump Station

Closes 11/25/2026Opened 10/20/2026

El Paso Water·Texas

74% match

On-Call Professional Engineering Services for Mechanical, Electrical, and Plumbing Engineering Services for Water, Wastewater, Reclaimed Water, Stormwater, and Administrative Facilities

Closes 12/2/2026Opened 10/25/2026

City of Beaumont·California

74% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Florida Keys Aqueduct Authority·Florida

74% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

City of Hollywood·Florida

74% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Maryland Mayor and Town Council of Oakland·Maryland

74% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026