Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›PEDESTRIAN SIGNAL INSTALLATIONS

Georgia City of Decatur·Georgia

PEDESTRIAN SIGNAL INSTALLATIONS

Closes 12/10/2025$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Decatur is seeking bids for the installation of pedestrian crossing signal equipment at two intersections: West Howard Avenue at Commerce Drive and West Howard Avenue at Paden Circle. The project includes traffic control, concrete, signing and pavement markings, signal installation, erosion control, and other related work. The contractor will be responsible for coordinating with DeKalb County and ensuring that all work is done in accordance with the Georgia Department of Transportation Standard Specifications for Construction of Transportation Systems. • The project requires the installation of pedestrian signal equipment, including poles, push buttons, and signals. • The contractor must ensure that all work is done in accordance with the Georgia Department of Transportation Standard Specifications for Construction of Transportation Systems. • The project includes traffic control, concrete, signing and pavement markings, signal installation, erosion control, and other related work. • The contractor will be responsible for coordinating with DeKalb County and ensuring that all work is done in accordance with the Georgia Department of Transportation Standard Specifications for Construction of Transportation Systems. • The contractor must provide a list of the last three clients/projects of the same general size and scope as this project. • The contractor must provide a bid bond, although it is noted that no bid bond is required.

Attached files

Contact

David Junger(Deputy City Manager)

[email protected]

(678) 553-6522

Key dates

Opened
11/14/2025
Questions due
11/26/2025
Pre-bid meeting
11/24/2025Mandatory
Site visit
11/24/2025Mandatory
Closes
12/10/2025
Projected award
12/15/2025
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE-64458-NONST-2026-000000019

Budget estimate

$200,000 – $500,000

Based on the scope of the project, which includes the installation of pedestrian signal equipment at two intersections, the estimated budget could range from $200,000 to $500,000. This estimate takes into account the cost of materials, labor, and equipment required for the project. The actual budget may vary depending on the bids received and the complexity of the work involved. Factors that may influence the likely payment range include the number of intersections, the type of equipment required, and the level of expertise needed to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 68%

Blank Out Signs and Traffic Components

Rolling / TBD closeOpened 8/20/2026

Town of Westwood·Massachusetts

68% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Richmond Government·Virginia

68% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Charlotte·North Carolina

67% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Sacramento·California

67% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of San Diego·California

67% match

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026Opened 10/12/2026

City of Charlotte·North Carolina

67% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

City of Clovis·California

66% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

City of Seattle·Washington

66% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

66% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Virginia Department of Transportation·Virginia

66% match

B37_2027 TRAFFIC SIGNAL AND SIDEWALK CONSTRUCTION

Closes 11/18/2026Opened 10/13/2026

NYS Monroe County·New York

66% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Bloomington·Indiana

66% match

3rd Street Traffic Signal Improvements S. Woodlawn Avenue & S. Hawthorne Drive

Closes 11/18/2026Opened 10/29/2026

City of Grand Island·Nebraska

66% match

Traffic Signal Poles - 13th Street/Diers Avenue; Project No. 2026-P-2 (REBID)

Closes 11/19/2026Opened 10/30/2026

City of Pasadena·California

66% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

Texas Montgomery County·Texas

65% match

Traffic Signal Detection Upgrades (CSJ: 0912-37-267)

Closes 11/12/2026Opened 10/21/2026

City of Charlotte·North Carolina

65% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

Connecticut Town of New Milford·Connecticut

65% match

Town of New Milford Grove St & Hine Hill Rd Signal Installation

Closes 11/5/2026Opened 9/18/2026

Maryland State Highway Administration·Maryland

65% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Bakersfield·California

65% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

Town of Bluffton·South Carolina

64% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

City of Redlands·California

64% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

Virginia Department of Transportation·Virginia

64% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Maryland State Highway Administration·Maryland

64% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Los Angeles County Public Works·California

64% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026