The Bureau of Land Management (BLM) is seeking bids for the construction of a shade structure at the Halfway Hollow Trailhead. The project requires a metal gauge of 24-gauge HR-36 steel for the top, and the roofing shall be pre-cut and pre-finished with ribs running with the slope of the roof. The period of performance is from April 1, 2026, to August 1, 2026.
* The project involves the construction of a shade structure
* The metal gauge required for the top is 24-gauge HR-36 steel
* The roofing shall be pre-cut and pre-finished with ribs running with the slope of the roof
* The period of performance is from April 1, 2026, to August 1, 2026