Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Civil Engineering
  5. ›Hammond Avenue - Storm Drainage Pipe Replacement

Carroll County·Maryland

Hammond Avenue - Storm Drainage Pipe Replacement

Closes 10/7/2026$300k – $600kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Carroll County Division of Roads Operations is soliciting lump‑sum bids to replace approximately 1,300 ft of deteriorated storm‑drainage pipe on Hammond Avenue and adjacent roadways in Eldersburg, MD. The work includes removal of existing corrugated metal pipe (CMP), installation of new high‑density polyethylene (HDPE) pipe sections (various sizes ranging from 18” × 61’ to 21” × 300’), excavation, backfill, traffic control, utility coordination, and final road patching. Bidders must submit a complete bid package (bid form, references, bid bond) electronically via Public Purchase by 10:30 AM EST on Oct 7, 2026. A pre‑bid conference is scheduled on‑site Sep 22, 2026 (attendance optional). The contract will be awarded to the lowest responsive and responsible bidder; work must be completed within 60 calendar days of notice to proceed, with liquidated damages of $500 per day for late completion. • Replace ~1,300 ft of storm‑drain pipe (HDPE) in multiple sections • Perform excavation, utility locate, traffic control, and road restoration • Submit lump‑sum bid electronically by Oct 7, 2026, 10:30 AM EST • Pre‑bid conference on‑site Sep 22, 2026, 10:00 AM EST (optional) • Required bid bond (5 % of base bid) and performance bond (100 % of contract) • Completion deadline: 60 days after notice to proceed; $500/day liquidated damages • Insurance, safety, and OSHA compliance mandatory

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Corey Hood(Bid Contact)

[email protected]

(410) 386-2182

Key dates

Opened
9/15/2026
Questions due
10/2/2026
Pre-bid meeting
9/22/2026
Closes
10/7/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
19-F-1-26/27

Budget estimate

$300,000 – $600,000

No contract value is disclosed. Based on typical costs for HDPE pipe replacement (material ≈ $150‑$200/ft), excavation, backfill, traffic control, and labor, a 1,300‑ft project in Maryland generally ranges from $300 k to $600 k. The lower bound assumes minimal traffic control and straightforward utility conditions; the upper bound accounts for complex utility relocations, higher labor rates, and extensive site restoration.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 76%

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

76% match

Euclid Avenue 1818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Charlotte·North Carolina

75% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

74% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

City of Shawnee·Kansas

74% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

74% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

74% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

74% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

City of Charlotte·North Carolina

74% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

City of Easley·South Carolina

73% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Brandon·Mississippi

73% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

73% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

73% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

73% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

James City County·Virginia

73% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

City of Charlotte·North Carolina

73% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

73% match

Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/29/2026

City of Anderson, SC·South Carolina

72% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

City of Charlotte·North Carolina

72% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

72% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

St. Tammany Parish Government·Louisiana

72% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

City of Charlotte·North Carolina

72% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

City of Charlotte·North Carolina

72% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

Louisiana St. Tammany Parish Government·Louisiana

72% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

City of Rancho Palos Verdes·California

72% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026