Miami‑Dade County’s Department of Solid Waste Management is expanding its used‑motor‑oil collection system at three neighborhood trash‑and‑recycling centers. The contractor will install permanent oil‑collection containers, concrete slab foundations, housing structures, tanks, traffic bollards, and designated parking spaces, while handling site clearing, temporary traffic control, permitting, and post‑construction restoration. Work must be performed Monday‑Friday, 7 AM‑5 PM, within a total construction window of 547 calendar days from the Notice‑to‑Proceed.
• Scope includes concrete slab construction (12 × 19 × 3.5 ft at West Little River; 10 × 12 × 0.5 ft at the other two sites) and installation of oil‑collection housings and ancillary items.
• Contractor must hold a Florida Certified General Building Contractor license (with a concrete sub‑license) and provide required insurance (CGL $300k/$600k, Auto $300k, WC as required).
• No bid or performance bonds are required; the award will be made to the lowest responsible bidder.
• Pre‑bid/site‑visit mandatory on 14 Jan 2026; RFIs due by 21 Jan 2026; bid sealed envelope due by 2 Feb 2026, 2 PM.
• Project budget is approximately $160 K; contractor responsible for all permits, testing, and restoration to pre‑construction conditions.