Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›Taxiway A Reconstruction & Drainage Improvements Phase 1

City of Cottonwood·Arizona

Taxiway A Reconstruction & Drainage Improvements Phase 1

Closes 8/24/2026$1.5M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cottonwood is soliciting bids for the reconstruction and drainage improvements of Taxiway A at the Cottonwood Municipal Airport. The project includes the removal of existing pavement, construction of new pavement, and drainage improvements. The city is looking for a contractor to provide phase 1 construction services. The project requires a contractor with experience in airport construction and drainage improvements. The contractor will be responsible for removing existing pavement, constructing new pavement, and installing drainage improvements. The city will select a contractor based on the lowest responsible and responsive bid. • The project includes the removal of 4,005 square yards of existing AC pavement. • The project includes the construction of 3,493 square yards of new AC pavement. • The project includes drainage improvements, including earthen berm, regrading, and seeding. • The project includes the construction of approximately 3,720 linear feet of new reclaimed water line. • The contractor will be required to attend a pre-construction meeting with city staff. • The contractor will be required to provide proof of insurance and bonds.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rod Propst(Accounting Manager)

[email protected]

(928) 340-2722

Key dates

Opened
7/28/2026
Questions due
8/13/2026
Pre-bid meeting
8/11/2026
Closes
8/24/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
FY27-AP-01

Budget estimate

$1,500,000 – $3,000,000

The budget for this project is estimated to be around $1,500,000 to $3,000,000, based on the scope of work and the materials required. The city is looking for a contractor to provide phase 1 construction services, which includes the removal of existing pavement, construction of new pavement, and drainage improvements. The project requires a significant amount of materials, including asphalt, concrete, and drainage pipes. The contractor will also need to provide labor and equipment to complete the project. The estimated budget range is based on the assumption that the contractor will need to hire a team of workers, purchase materials, and rent equipment to complete the project. The city may also require the contractor to provide bonds and insurance, which will add to the overall cost of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Raleigh Durham Airport Authority·North Carolina

Top match · 76%

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

U.S. Department Of Defense·South Carolina

74% match

PSTE 162013 Repair and Widen Taxiways, Phase III

Closes 1/29/2027Opened 1/29/2026

Port of Portland·Oregon

74% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

Raleigh Durham Airport Authority·North Carolina

73% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Delaware Coastal Airport·Delaware

72% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026

Niagara Frontier Transit Authority (NFTA)·New York

72% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

Port of Portland·Oregon

71% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Defense·Virginia

71% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026

NYS Niagara Frontier Transportation Authority·New York

71% match

NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/5/2026

City of Charlotte·North Carolina

71% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Calhoun County Board of County Commissioners·Florida

70% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Doge City·Kansas

69% match

Red Demon Drive Improvements (due 11/03 @ 1:45pm)

Rolling / TBD closeOpened 9/25/2026

The Village of Royal Palm Beach·Florida

69% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

Town of Eatonville·Florida

69% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Lebanon·Indiana

69% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

U.S. Department Of Defense·South Carolina

69% match

Repair Taxiway Alpha & Bravo - North Auxiliary Airfield

Closes 12/2/2026Opened 10/30/2026

City of Charlotte·North Carolina

69% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Municipality of Anchorage·Alaska

69% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

League City·Texas

69% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Transportation·Hawaii

69% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

City of Chelan, WA·Washington

69% match

Airport Watermain Extension

Closes 11/5/2026Opened 10/16/2026

Village of Glenview·Illinois

68% match

Crabtree Ln, Linneman St, Virginia Ln Roadway & Utility Improvements

Closes 11/12/2026Opened 10/29/2026

Georgia City of Peachtree City·Georgia

68% match

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026Opened 10/15/2026

Delta Airport Consultants·Virginia

68% match

COMING SOON - Rural Retreat, VA - Mtn. Empire Ap. - Construct Taxilane and Hangar Sites (23038)

Rolling / TBD closeOpened 4/1/2026