Coastal Carolina University is seeking a qualified, properly licensed electrical contractor to design‑build and install the complete electrical power infrastructure and signal‑cable pathways for a new center‑hung video‑display system and scorer’s‑table equipment in the HTC Center arena. The contract will be awarded on a lump‑sum basis and must include all labor, materials, equipment, lifts, mobilization, permits, inspections, testing, documentation, and any other items required for full performance. Bidders must submit a detailed pricing breakdown for informational purposes, list any exclusions or deviations, and identify any subcontractors. The work must be coordinated to avoid disruption to arena operations, with installation primarily scheduled during evening hours in two phases (Oct 21‑27 and Nov 12‑18, 2026). The contractor must hold a valid South Carolina electrical contractor license, meet insurance requirements, and may claim state‑resident preferences if eligible.
• Scope: Design‑build electrical power and signal‑cable pathways for the center‑hung video display and scorer’s table in the HTC Center.
• Delivery: Lump‑sum bid covering all labor, materials, equipment, permits, testing, and documentation; separate schedule of exclusions and subcontractor details required.
• Requirements: South Carolina contractor license, minimum insurance coverage, compliance with safety, ADA, FERPA, and tax‑withholding rules; optional resident‑vendor preference claims.
• Timeline: Bid opening Sep 16 2026; submission deadline Oct 13 2026; award Oct 19 2026; installation phases Oct 21‑27 and Nov 12‑18 2026.
• Optional Site Visit: Non‑mandatory visit on Sep 23 2026 at 9:00 AM.