Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›Regional Justice Center Central Plant: Chilled Water Pump…

Nevada Government·Nevada

Regional Justice Center Central Plant: Chilled Water Pump, Chiller Valve & Condenser Water Strainer Replacement

Closes 4/30/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Clark County Invitation for Bid is for the replacement of the Regional Justice Center central plant's chilled water pump, chiller valve, and condenser water strainer. The scope of work includes the removal and replacement of three chiller isolation valves, three primary chiller pumps, and three secondary chiller pumps, as well as demolition and replacement of hydronic piping, insulation, pressure gauges, and condenser water t-strainer baskets. The existing overhead roll-up door will be removed and replaced with a larger unit to accommodate new equipment, and electrical conduit, light fixtures, and mechanical ductwork will be relocated or replaced as needed. • The bid includes a pre-bid conference and site walk, which will be held on October 15, 2025. • The bid opening will be held on Webex, and the meeting information is provided in the document. • The bid is open to qualified firms or individuals, and questions regarding the bid must be directed to the bid contact listed in the document.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Geraldine Cruz(Bid Contact)

[email protected]

(702) 455-6277

Key dates

Opened
10/8/2025
Questions due
10/22/2025
Pre-bid meeting
10/15/2025
Site visit
10/15/2025
Closes
4/30/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
607743-25 Addendum 2

Budget estimate

$500,000 – $2,000,000

The budget for this bid is not specified in the document. However, based on the scope of work, which includes the replacement of mechanical equipment and the modification of the existing building structure, the budget is likely to be in the range of $500,000 to $2 million. This estimate is based on the assumption that the replacement of the chilled water pump, chiller valve, and condenser water strainer, as well as the demolition and replacement of hydronic piping, insulation, pressure gauges, and condenser water t-strainer baskets, will require significant labor and materials costs. Additionally, the modification of the existing overhead roll-up door and the relocation or replacement of electrical conduit, light fixtures, and mechanical ductwork will also contribute to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Community College System - System Office·Virginia

Top match · 74%

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

Trident Technical College·South Carolina

73% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

University of South Carolina·South Carolina

73% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Trident Technical College·South Carolina

72% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

U.S. Department Of Defense·Connecticut

72% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/20/2026Opened 9/30/2026

UCLA Capital Programs·California

71% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

University of Missouri-Kansas City·Missouri

71% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

City of Dayton, Ohio·Ohio

71% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

71% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

Town of Jupiter·Florida

70% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Upper Occoquan Service Authority·Virginia

70% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

U.S. Department Of Veterans Affairs·New York

70% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

University of Massachusetts·Massachusetts

70% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

Manatee County - Purchasing Division·Florida

69% match

CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR JUDICIAL CENTER CHILLER REPLACEMENT

Closes 12/10/2026Opened 10/7/2026

State University of New York (SUNY)·New York

69% match

Chiller/Boiler Upgrades Johnson City Center - Mechanical & Plumbing

Closes 11/12/2026Opened 10/21/2026

The Metropolitan Water District of Southern California·California

69% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026