The City of Bellevue is soliciting bids for the complete demolition, removal, and replacement of the Robinswood Playground. The scope includes demolition of existing equipment, site grading, new storm‑water and domestic water connections, installation of two new playground systems (ages 2‑5 and 5‑12) with engineered wood‑fiber mulch and artificial‑turf safety surfacing, drainage improvements, a prefabricated steel shelter, concrete/asphalt paving, portable restroom enclosure, ornamental plantings, and upgrades to the existing irrigation system. The estimated construction value is $970,000‑$1,030,000. Bidders must submit their proposals by October 8, 2026. A non‑mandatory pre‑bid conference and site walk will be held on September 30, 2026.
• Demolition of existing playground equipment and site preparation
• Installation of new playground equipment for two age groups with safety surfacing
• New water‑line extension, storm‑water connections, and irrigation upgrades
• Prefabricated steel shelter, concrete/asphalt paving, and portable restroom
• Landscaping, ornamental planting, and drainage improvements
• Estimated contract value: $970k‑$1.03M; bid submission deadline Oct 8, 2026.