Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Aluminum Pedestrian Truss Bridge

U.S. Department Of Homeland Security·Georgia

Aluminum Pedestrian Truss Bridge

Closes 9/18/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Federal Law Enforcement Training Center (FLETC) seeks a single vendor to supply a new, marine‑grade aluminum pedestrian truss bridge (50‑ft clear span, 5‑ft clear width) with integrated guardrail, high‑traction decking, and built‑in LED lighting. The bridge must be delivered FOB destination to FLETC’s Brunswick, GA facility, be new only, and include manufacturer’s warranty, detailed drawings, specifications, and a delivery schedule. Evaluation will consider price, technical compliance, and delivery timeline. Offers must be submitted electronically by the closing date, include SAM registration (UEI), and be accompanied by required technical and pricing attachments. • Scope: One (1) aluminum Howe‑type truss bridge, 50 ft span, 5 ft clear width, 42‑in guardrail, LED mid‑rail lighting, marine‑grade finish. • Delivery: FOB destination (Brunswick, GA, 1131 Chapel Crossing Rd); vendor must state estimated delivery days after PO receipt. • Contract type: Firm‑fixed‑price, single award. • Evaluation factors: Price, technical acceptance (design loads, ASCE 7‑05 wind, 90 psf pedestrian load, 2,500 lb vehicular load), and delivery schedule. • Mandatory requirements: New parts only, manufacturer’s warranty, SAM registration, UEI on quote, detailed drawings/specs, delivery statement. • Submission: Email quote and attachments to [email protected] by 18 Sep 2026 14:00 HRS. • No small‑business set‑aside; open to all qualified vendors.

Attached files

Contact

Jeffrey E. Redecker

[email protected]

(912) 267-2829

Key dates

Opened
9/15/2026
Closes
9/18/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
332312
Solicitation №
FLETC26EOYTTO0014

Budget estimate

$200,000 – $500,000

Based on typical costs for a 50‑ft marine‑grade aluminum pedestrian bridge with integrated guardrail, decking, and LED lighting, the unit price is likely in the $200,000‑$500,000 range. Factors influencing the final price include material thickness, finish specifications, lighting system complexity, warranty terms, and delivery logistics to the Brunswick, GA site.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

Top match · 65%

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

Division of Highways·North Carolina

64% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

BREC·Louisiana

64% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

64% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Delaware River Joint Toll Bridge Commission·New Jersey

63% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

County of Marin·California

63% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Columbia·Missouri

63% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

62% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

City of Seattle·Washington

62% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Cherry Hill Township·New Jersey

62% match

2026 Downs Farm Bridge Re-Bid #1

Closes 11/10/2026Opened 10/27/2026

LA Public Works Engineering Bureau·California

62% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Connecticut Town of Cheshire·Connecticut

62% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of St. Louis·Missouri

62% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Connecticut Town of Cheshire·Connecticut

62% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Cobb County, GA·Georgia

62% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Alexandria·Louisiana

62% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

City of Keene·New Hampshire

61% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

Georgia Cobb County Department of Transportation·Georgia

61% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Minnesota Department of Administration·Minnesota

60% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Richmond·California

60% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

City of Long Beach·California

60% match

R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Transportation·Utah

60% match

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Closes 11/19/2026Opened 9/29/2026

City of Sacramento·California

60% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Meriden·Connecticut

60% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Connecticut City of Meriden·Connecticut

59% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026