Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›CEE X-PRO II SPINNER-HOTPLATE WORKSTATION

National Aeronautics And Space Administration·Mississippi

CEE X-PRO II SPINNER-HOTPLATE WORKSTATION

Closes 4/16/2026$100k – $150kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The NASA/NSSC is seeking a CEE X-PRO II SPINNER-HOTPLATE WORKSTATION to support microfabrication for the Habitable Worlds Observatory and other projects. The workstation should be capable of processing wafers from 100mm to 200mm with precise resist thickness control and exceptional uniformity across the entire substrate. The required equipment features include programmable recipe storage, advanced automated controls, and built-in safety systems. The vendor shall deliver the workstation to NASA GSFC with all item selections, including safety kit, Apogee 200 spinner coater, bowl liners, dispense arm, and other components. • The workstation should have programmable recipe storage and advanced automated controls. • The workstation should have built-in safety systems to improve process reliability and repeatability. • The vendor shall deliver the workstation with all item selections, including safety kit, Apogee 200 spinner coater, bowl liners, and other components. • The deliverable schedule begins at the Date of Award, and the vendor shall ship all parts to NASA/GSFC within 16 weeks. • The period of performance for this statement of work is twelve to sixteen weeks from the date of award.

Attached files

Contact

Cody Guidry(Procurement Specialist)

[email protected]

Key dates

Opened
4/13/2026
Closes
4/16/2026
Duration
12 weeks

Last updated

Details

Type
Sole Source
Industry
Aerospace and Defense
NAICS
334516
Solicitation №
80NSSC26929804Q

Budget estimate

$100,000 – $150,000

The budget for this opportunity can be estimated based on the cost of the CEE X-PRO II SPINNER-HOTPLATE WORKSTATION. The cost of such equipment can range from $50,000 to $200,000, depending on the specifications and features. Considering the requirements mentioned in the document, the estimated budget can be around $100,000 to $150,000. The factors that may influence the likely payment range include the cost of the equipment, the complexity of the installation, and the requirements for maintenance and support.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

National Aeronautics And Space Administration·Alabama

Top match · 60%

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Conventional friction stir extrusion machine (MFS-TOPS-126)

Closes 3/2/2027Opened 3/24/2026

U.S. Department Of Energy·New York

59% match

HSR HF Dipole and Quad SC Magnet PS and Quench

Closes 12/11/2026Opened 10/28/2026

Navajo Nation·Arizona

59% match

Proposal for IT Server Upgrade

Rolling / TBD closeOpened 6/18/2025

U.S. Department Of Energy·Washington

59% match

HIP CAN Study

Closes 11/13/2026Opened 10/19/2026

U.S. Department Of Energy·Ohio

58% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Wick and Fill Platform

Closes 12/3/2026Opened 6/4/2026

Technical College System of Georgia·Georgia

58% match

41500 - Simulated Work Environment

Closes 11/18/2026Opened 10/27/2026

U.S. Department Of Defense·Oklahoma

58% match

Upgrade X-Ray Controller

Closes 11/5/2026Opened 10/29/2026

Oregon Department of Transportation·Oregon

58% match

Bend Shop Plasma Table

Closes 11/2/2026Opened 10/13/2026

U.S. Department Of Energy·Ohio

58% match

TECHNOLOGY LICENSING OPPORTUNITY: Spectrometer Purposed for Accelerator Testing and Characterization (SPATC)

Closes 2/1/2027Opened 8/5/2026

The University of Iowa·Iowa

58% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

National Aeronautics And Space Administration·Florida

58% match

Sealing Machines for CHOP Shop

Closes 11/2/2026Opened 10/28/2026

U.S. Department Of Defense·Florida

58% match

Ergonomic Workstations JTF WHEM

Closes 11/23/2026Opened 10/23/2026

Eastern Oregon University·Oregon

58% match

RFP #2026-05 Magnetron Sputtering Deposition System

Closes 11/6/2026Opened 10/24/2026

Florida State University·Florida

57% match

Rotary Uninterruptible Power System

Closes 11/2/2026Opened 9/8/2026

U.S. Department Of Defense·Oklahoma

57% match

NSN:1680-01-232-5160RK NOUN:TORQUE LIMITER ASSE P/N: NF53400-03A

Closes 12/21/2026Opened 10/21/2026

University of South Carolina·South Carolina

57% match

Notice Of Intent To Sole Source

Rolling / TBD closeOpened 8/12/2026

University of South Carolina·South Carolina

57% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Texas Department of Transportation·Texas

57% match

X-Ray Tube for XRF Spectrometer Equipment

Closes 11/3/2026Opened 10/20/2026

Hampton Roads Sanitation District·Virginia

57% match

408394 - Telehandler Jib Crane Attachment

Closes 11/4/2026Opened 10/26/2026

UCLA Capital Programs·California

57% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

57% match

FD2030-26-02399

Closes 7/16/2027Opened 7/15/2026

U.S. Department Of Defense·Maryland

57% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

U.S. Department Of Defense·Washington

57% match

Accelerometer

Closes 11/6/2026Opened 10/28/2026

Texas A&M University System·Texas

57% match

CNC Wire EDM Machine

Closes 11/13/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

57% match

TORQUE ADAPTER ASSE

Closes 11/30/2026Opened 10/23/2026