The Federal Bureau of Investigation (FBI) is seeking vendors for the construction of the Multi-Purpose Range Complex (MPRC) at the FBI's South Campus, Redstone Arsenal, Alabama. The project includes demolition of existing structures, sitework, and construction of buildings, structures, and sand pits to support the FBI's mission. The scope of work includes all labor, materials, equipment, and supervision necessary for site preparation, structural construction, interior and exterior finishes, mechanical, electrical, and plumbing systems, as well as all associated site utilities. Key features of the project include:
• Construction of a classroom, render safe test facility, workshop, covered storage, vehicle wash, and fuel station
• Renovation of an existing range, including the addition of an operations building, firing shed, bleachers, and an inerting building
• Installation of a government-furnished, contractor-installed ARMAG inerting building
• Provision of temporary security requirements, including a temporary control location and fiber communication line
The FBI requires a firm-fixed-price contract with a period of performance of approximately 243 days. The estimated magnitude of the construction project is between $25,000,001 and $100,000,000.