The State of Michigan is seeking a contractor to perform steam tunnel repair and water infiltration study at the Secondary Complex in Lansing. The project involves repairing spalls and delaminations in the concrete tunnel, replacing structural steel stanchions, and performing other related work. The contractor will be required to temporarily move and re-attach utilities that are obstructing work, and to inspect repair areas and verify delaminations using a sounding tool. The project is expected to be substantially complete by January 2027.
Some key aspects of the project include:
• Repairing spalls and delaminations in the concrete tunnel
• Replacing structural steel stanchions
• Temporarily moving and re-attaching utilities that are obstructing work
• Inspecting repair areas and verifying delaminations using a sounding tool
• Coordinating work with other trades and obtaining engineer's review prior to making alterations to structural items
• Maintaining work area cleanliness to allow unimpeded operations to continue