The City of Roseville is soliciting proposals from qualified contractors for the design, procurement, and installation of a pre-engineered metal canopy at the Pleasant Grove Wastewater Treatment Plant. The scope includes all necessary elements to provide complete and functional canopy systems, including structural steel primary and secondary members, purlins, girts, column base plates, and anchor bolts, metal roofing systems, trim, flashing, gutters, and downspouts, lighting, and reinforced concrete footings. The contractor shall deliver a turnkey, code-compliant canopy system, including engineered foundations, stamped design documents, and all necessary labor, materials, and equipment. Key tasks include project management, licensed professional engineering design services, mobilization and demobilization, material procurement, construction, and other costs.
• The project requires a mandatory pre-proposal conference and job walk.
• The contractor must provide a total cost proposal, including a breakdown of costs by task.
• The contractor must provide proof of registration with the California Secretary of State.
• The contractor must submit a proposal that includes all required information and documents, including a cover letter, firm qualifications, experience and references, team qualifications, project understanding, project plan, and cost proposal.