Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›Waddell Pumping Plant KW1A Transformer Repair

Central Arizona Project·Arizona

Waddell Pumping Plant KW1A Transformer Repair

Closes 10/14/2026$150k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Central Arizona Water Conservation District (CAWCD) is seeking qualified contractors to perform a complete repair of the KW1A transformer at the Waddell Pumping Plant. The work includes physical separation, gas enclosure, electrical isolation, de‑gassing, and related testing as detailed in the attached technical specifications. A mandatory pre‑proposal conference will be held on September 22, 2026 at the plant site. Proposals are due electronically by October 14, 2026, with contract award expected October 19, 2026 and final deliverables required by December 21, 2026. Evaluation will consider technical compliance, experience, quality‑assurance processes, schedule, warranty, and price. The contractor must meet extensive insurance, OSHA VPP, and safety requirements, and will be responsible for all permits, inspections, and cleanup. • Scope: Full repair of KW1A transformer (mechanical, electrical, gas handling). • Mandatory pre‑proposal conference: Sep 22, 2026 (on‑site). • Proposal deadline: Oct 14, 2026 (electronic). • Award date: Oct 19, 2026; completion deadline: Dec 21, 2026. • Evaluation criteria weighted across technical, experience, QA, schedule, and price. • Required insurance limits and OSHA VPP compliance. • Primary contact: Kyle Talbert (623‑869‑2409, [email protected]).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kyle Talbert

[email protected]

(623) 869-2409

Key dates

Opened
9/10/2026
Questions due
9/29/2026
Pre-bid meeting
9/22/2026Mandatory
Closes
10/14/2026
Projected award
10/19/2026
Duration
2 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
C118278

Budget estimate

$150,000 – $500,000

The solicitation does not disclose a contract value. Based on typical costs for a full‑scale, high‑voltage transformer repair—including labor, specialized equipment, testing, gas handling, and insurance—projects of this size generally fall between $150,000 and $500,000. Factors influencing the final amount include the transformer’s rating, extent of internal component replacement, travel and mobilization costs to the Waddell site, and any required warranty or extended service agreements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 69%

TRANSFORMER

Closes 11/6/2026Opened 9/25/2026

Santa Clara Valley Water District·California

68% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of Glendale·California

68% match

TRANSFORMER & LTC REPAIR

Closes 11/5/2026Opened 9/22/2026

City of Douglas WY·Wyoming

68% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

Upper Occoquan Service Authority·Virginia

68% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

KC Board of Public Utilities·Kansas

67% match

Nearman N1 Generator Step Up Transformer

Closes 12/11/2026Opened 9/25/2026

Town of Narragansett·Rhode Island

67% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

New York City Department of Environmental Protection·New York

66% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

U.S. Department Of Defense·Illinois

66% match

CSSC Utility Feed Transformer Replacement

Closes 11/5/2026Opened 10/27/2026

Hawaii Department of Defense·Hawaii

66% match

TRANSFORMER REPLACEMENT

Closes 11/19/2026Opened 10/19/2026

City of Branson·Missouri

66% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Richland·Washington

66% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

U.S. Department Of Defense·Washington

66% match

NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1

Closes 11/30/2026Opened 10/27/2026

City of Hollywood·Florida

66% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Georgia Macon Water Authority·Georgia

66% match

AWTP-(2) 1000 Hp Reservoir Vertical Turbine

Closes 11/17/2026Opened 10/2/2026

Massachusetts Peabody Municipal Light Plant·Massachusetts

66% match

THREE PHASE 23KV PADMOUNT TRANSFORMERS

Closes 11/5/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

66% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

Utility Board of the City of Key West·Florida

66% match

Specifications for Emergency Repair of 69kV Transmission Line 1

Closes 11/27/2026Opened 10/29/2026