Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Civil Engineering
  5. ›Trail Improvements - Old Croton Aqueduct

Parks Recreation & Historic Preservation, NYS Office of·New York

Trail Improvements - Old Croton Aqueduct

Closes 5/20/2026$150k – $450kRequest for QuotationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Office of Parks, Recreation and Historic Preservation (OPRHP) is seeking quotes for the reconstruction of 1,570 lf oftrail located within the Old Croton Aqueduct trail system. Work will consist of clearing, widening the trail to 8ft as well asremoval of rocks and dirt mounds. Trail will be resurfaced with compacted gravel aggregate material (Ideally a naturepathway mix). Three or more drainage structures must be installed at critical points. Trail approaches will also be surfaced,compacted, and graded to a general thickness of 3-4 inches. The contractor must assess landscape with OPRHP TrailsCoordinator to determine the locations of drainage structures; therefore, a site visit is mandatory for this project. Pleaseschedule site visits with Devin DeSantis (845) 370-6802 [email protected], and Steven Oakes (845) [email protected]. Additional details regarding this project are available in the Work Scope document provided. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: none

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sandra Wiley(Primary Contact)

[email protected]

(845) 889-3857

Key dates

Opened
4/29/2026
Closes
5/20/2026
Duration
60 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
237310
Solicitation №
TA-2026-SW-008

Budget estimate

$150,000 – $450,000

The budget for this project can be estimated based on the scope of work, which includes the reconstruction of 1,570 linear feet of trail. The cost of trail reconstruction can vary depending on the location, materials, and labor costs. However, a rough estimate for a similar project could be around $100 to $300 per linear foot, which would put the total project cost between $157,000 and $471,000. Factors that may influence the likely payment range include the cost of materials, labor costs, and the complexity of the project. Therefore, a reasonable estimate for the budget for this project could be between $150,000 and $450,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Simsbury·Connecticut

Top match · 69%

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Connecticut City of Middletown·Connecticut

66% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Kenosha County·Wisconsin

66% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Delaware County·Pennsylvania

66% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

City of Green Bay·Wisconsin

66% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Middletown·Connecticut

66% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

County of Fairfax·Virginia

66% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Keene·New Hampshire

66% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Maryland Department Of General Services·Maryland

66% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Environmental Conservation, NYS Department of·New York

65% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

Santa Maria-Bonita School District·California

65% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

City of Melbourne·Florida

65% match

Lower Croton Force Main

Closes 11/23/2026Opened 10/23/2026

City of Goshen, Indiana·Indiana

65% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

City of Hutchinson·Kansas

64% match

Request for Proposal Jim Martinez Trail

Closes 11/20/2026Opened 10/26/2026

Connecticut Town of Waterford·Connecticut

64% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

City of Cincinnati·Ohio

64% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Etowah·Arkansas

64% match

PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL, REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS

Closes 11/10/2026Opened 10/18/2026

City of Farmington·New Mexico

64% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Georgia Liberty County Board of Commissioners·Georgia

64% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

64% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Minnesota Department of Administration·Minnesota

64% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Maryland Department of Natural Resources·Maryland

64% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Ormond Beach - Purchasing Office·Florida

64% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Howard County, Office of Procurement·Maryland

64% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026