Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›WOLCOTT HILL ROAD SEWER MAIN EXTENSION WETHERSFIELD…

The Metropolitan District·Connecticut

WOLCOTT HILL ROAD SEWER MAIN EXTENSION WETHERSFIELD, CONNECTICUT

Closes 9/9/2026$50k – $100kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Metropolitan District seeks a qualified contractor to install approximately 300 feet of new 8‑inch PVC sewer main, construct three new sewer manholes, and install five new 6‑inch PVC laterals serving multiple properties on Wolcott Hill Road in Wethersfield, CT. The work includes all labor, equipment, permits, and both temporary and permanent surface restoration as detailed in Section 01010. • Install 300 ft of 8‑inch PVC sewer main • Construct three new sewer manholes • Install five 6‑inch PVC laterals to serve specific addresses • Provide full permitting, excavation, and surface restoration • Follow specifications outlined in the project’s Summary of Work (Section 01010)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dana Chalupka(Contract Specialist)

(860) 278-7850

Key dates

Opened
8/7/2026
Questions due
8/25/2026
Closes
9/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2026B-15

Budget estimate

$50,000 – $100,000

Based on typical costs for municipal sewer line projects (PVC pipe, manhole construction, excavation, and surface restoration), a 300‑ft 8‑inch pipe installation with three manholes and five laterals would likely range from $50,000 to $100,000. This estimate accounts for material prices (~$20‑$30 per foot for pipe and fittings), labor and equipment (~$30‑$40 per foot), manhole construction (~$5,000–$7,000 each), and site restoration. Local labor rates and any required permitting could shift the total upward, while competitive bidding could bring it toward the lower end.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Simsbury·Connecticut

Top match · 67%

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Connecticut Metropolitan District Commission·Connecticut

67% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Miami-Dade County·Florida

67% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

County of York·Virginia

67% match

#B128260-GW Route 17 Sewer Extension

Closes 12/3/2026Opened 10/30/2026

Connecticut Town of Wethersfield·Connecticut

67% match

IMPROVEMENTS TO COPPERMILL RD CULVERT ALONG GOFF BROOK

Closes 11/6/2026Opened 10/9/2026

Town of Bennington·Vermont

67% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Massachusetts Town of Ayer·Massachusetts

66% match

Fitchburg Road Sewer Main Extension - Phase 1

Closes 12/11/2026Opened 10/28/2026

Delaware County Regional Sewer District·Ohio

66% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

City of Mansfield·Texas

66% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

Town of Glastonbury·Connecticut

66% match

Sewage Sludge & Wastewater Hauling and Disposal

Closes 11/10/2026Opened 10/23/2026

Town of South Hill·Virginia

66% match

Advertisement for Bids: Plank Road Sewer Extension

Closes 12/10/2026Opened 10/29/2026

Hastings Utilities·Nebraska

66% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Hastings Public Works / Utilities·Nebraska

66% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

Town of Chase City·Virginia

65% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

Clermont County - Board of Commissioners·Ohio

65% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Connecticut Cromwell Fire District·Connecticut

65% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Connecticut City of Norwalk·Connecticut

65% match

DPW2026-2 DREDGING OF STORM OUTFALL AT 160 WATER STREET

Closes 11/19/2026Opened 10/30/2026

Connecticut Town of Plainfield·Connecticut

65% match

MS4 Stormwater GIS Data Development Screening and Reporting Services

Closes 11/4/2026Opened 9/17/2026

City of Thomas·Oklahoma

65% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

Massachusetts Town of Holliston·Massachusetts

65% match

WWTP Yard Piping Phase 1D

Closes 11/12/2026Opened 10/21/2026

Catawba Regional Council of Governments·South Carolina

65% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Town of Waterford·Connecticut

65% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

Closes 11/12/2026Opened 10/16/2026

Connecticut Town of South Windsor·Connecticut

65% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Town of Waterford·Connecticut

65% match

Cross Country Sewer Easement Access Contract One -Phase 2

Closes 11/12/2026Opened 10/16/2026

City of Braintree·Massachusetts

65% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026