This solicitation calls for a comprehensive upgrade of the Douglas Office Building’s chilled‑water plant, including demolition of existing equipment, installation of a new 600‑ton water‑cooled chiller, cooling towers, pumps, rooftop fans with VFDs, and associated structural, plumbing, and electrical work. The contractor must also provide temporary cooling during shutdowns, integrate all new equipment with the building automation system, and comply with EPA refrigerant recovery and Florida licensing requirements.
• Provide a 600‑ton water‑cooled chiller, cooling towers, pumps, refrigerant monitoring, and emergency exhaust fan.
• Perform full demolition of existing plant, recover refrigerant, and dispose of all materials per regulations.
• Supply and operate temporary cooling equipment to maintain critical building temperatures during the construction period.
• Design and install structural supports, plumbing make‑up/blow‑down connections, and upgraded electrical distribution with BAS integration.
• Submit detailed references of three similar chilled‑water plant projects completed within the last five years, including personnel roles, client contacts, contract values, and acceptance documentation.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.