The Sequoia Union High School District is soliciting sealed bids for a comprehensive roof‑replacement program at Sequoia High School. The scope covers demolition of existing built‑up and asphalt‑shingle roofs on multiple campus buildings, installation of structural decking, polyisocyanurate insulation, a hybrid modified‑bitumen membrane system (Garland Company’s KEE‑Stone system), optional asphalt‑shingle roofing, full metal‑flashings, gutters, down‑spouts, roof drains, and associated hazardous‑material (asbestos and lead) abatement. Bidders must be California‑licensed (General Building B or Roofing C‑39), pre‑qualified as a Garland‑approved installer, and satisfy extensive public‑works, prevailing‑wage, safety, environmental, and insurance requirements. The bid package includes a 10 % bid bond, and award will be made to the lowest responsive and responsible bidder.
• Complete roof demolition, deck replacement, insulation, hybrid membrane, flashing, and optional shingle work across four school buildings.
• Mandatory pre‑bid conference/site walk on March 3 2026; questions due March 12 2026.
• Requires certifications for asbestos and lead abatement, Garland installer certification, and full public‑works compliance (DIR registration, prevailing‑wage, safety plans).
• Bid submission deadline: March 19 2026 2 PM; post‑bid interview within 3 days of opening; performance and payment bonds of 100 % required after award.