Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›TSM0010252 Avalon Boulevard TSSP - 126TH Street to…

Los Angeles County Public Works·California

TSM0010252 Avalon Boulevard TSSP - 126TH Street to Sepulveda Boulevard

Closes 8/18/2026$2M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Implementation of a comprehensive traffic signal improvement and synchronization program along Avalon Boulevard from 126th Street to Sepulveda Boulevard, covering roughly 25 intersections. The work includes design, supply, and installation of traffic signals, lighting, poles, mast arms, vehicle and pedestrian heads, detection equipment, and associated civil works such as excavation, concrete, and paving. • Provide and install traffic signal hardware (signals, detectors, poles, mast arms) for 25 intersections. • Perform civil construction activities including excavation, concrete removal, backfill, paving (AC and PCC), and curb & gutter work. • Include a traffic signal synchronization program and associated software integration. • Follow a detailed schedule of prices with stipulated unit prices for schedule items and an allowance for exploratory utility excavation ($18,750). • All work must comply with Los Angeles County Public Works specifications and be completed by the contract deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
7/21/2026
Closes
8/18/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Solicitation No. 48259

Budget estimate

$2,000,000 – $5,000,000

The contract will likely range between $2 million and $5 million. The estimate draws on the listed unit‑price items (totaling roughly $22,250 for schedule items) plus extensive civil work such as excavation, concrete, paving, and utility installation, which typically run into the high‑hundreds of thousands to several million dollars for a 25‑intersection traffic signal program in Los Angeles County.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

LA Public Works Engineering Bureau·California

Top match · 72%

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

County of Los Angeles Department of Public Works·California

65% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

Clark County·Nevada

65% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

City of Vernon·California

65% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

65% match

Ames Blvd. Lighting: From Lapalco Blvd. to Barataria Blvd

Closes 12/3/2026Opened 10/14/2026

Nevada Government·Nevada

64% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Rancho Cordova·California

64% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

Idaho Transportation Department·Idaho

64% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Santa Ana·California

64% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

The City of Anaheim·California

64% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

Los Angeles County Public Works·California

64% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

County of Los Angeles Department of Public Works·California

64% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026

City of San Antonio·Texas

64% match

23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 11/6/2026Opened 9/30/2026

Texas City of San Antonio·Texas

63% match

Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 11/6/2026Opened 9/30/2026

City of San Clemente·California

63% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

City of San Antonio·Texas

63% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Nevada Government·Nevada

63% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Maryland State Highway Administration·Maryland

63% match

BAB155179 - MD 150 (Eastern Boulevard) from MD 702 (Southeast Expressway) to MD 700 (Martin Boulevard) Pedestrian Safety Action Plan (PSAP)

Closes 12/3/2026Opened 10/27/2026

County of San Luis Obispo·California

63% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

Texas City of San Antonio·Texas

63% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Jefferson Parish Government·Louisiana

63% match

Bid Event #234 - Ames Blvd. Lighting: From Lapalco Blvd. to Barataria Blvd. Public Works Project No. 2025-005-SL

Closes 12/3/2026Opened 10/14/2026

City of San Antonio·Texas

63% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Torrance·California

63% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City and County of San Francisco·California

62% match

EXT REC | CON27-0011 Alta Plaza Pathways - MLBE

Closes 11/19/2026Opened 10/27/2026

City of Rancho Palos Verdes·California

62% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026