The City of Garland is soliciting a competitive sealed proposal for comprehensive construction services to deliver the Duck Creek Waste‑Water‑Treatment‑Plant (WWTP) Administration Operations Facility located at 750 Duck Creek Way, Sunnyvale, TX 75182. The scope includes demolition of existing structures, site grading, utility installation, structural and architectural construction of a one‑story, 8,910 SF building, interior laboratory and office fit‑out, fire‑protection systems, mechanical/electrical/plumbing (MEP) work, technology and AV integration, and all associated permitting, inspections, and close‑out documentation. The contractor must attend an optional pre‑bid virtual meeting (09/23) and an optional site visit (09/24), submit questions by 10/09, and deliver a full electronic bid by 10/22. The contract will be awarded to the most advantageous offer based on price and evaluation criteria.
• Demolition of existing pavement, curb, and structures.
• Earthwork, grading, and erosion control.
• Construction of a Type II‑B, sprinklered, one‑story building (≈8,910 SF).
• Interior lab spaces, conference rooms, offices, restrooms, and support areas.
• Full MEP systems (HVAC, plumbing, fire protection, electrical, technology).
• AV, video‑surveillance, and touch‑screen control systems.
• Compliance with IBC, NFPA, ADA, Texas Accessibility Standards, and local specifications.
• Required coordination with city traffic, utilities, and right‑of‑way.