The Drowning Creek Water and Sewer Project is a municipal infrastructure contract focused on installing new ductile‑iron water and gravity sewer mains, de‑commissioning an existing pump station, and restoring the affected roadway corridor in Gwinnett County, GA. The contractor will be responsible for trenching, pipe installation, manhole placement, traffic and erosion control, and environmental restoration, with a performance schedule of roughly 520 calendar days after notice to proceed.
• Install ~9,000 LF of 16‑in. ductile‑iron water main and ~12,500 LF of 24‑in. gravity sewer main.
• Provide full roadway and stream‑crossing restoration, including asphaltic concrete, curbs, sidewalks, and wetlands mitigation.
• Manage traffic control, erosion‑sedimentation controls, and the demolition/abandonment of the Harbins Landing Pump Station.
• Pre‑qualified contractors only; mandatory pre‑qualification for large‑diameter gravity sewer (>12 in.) and medium‑size pressurized water (16‑24 in.).
• Bids must be submitted sealed by August 21, 2026; pre‑bid conference on July 28, 2026 (non‑mandatory).