The project calls for a comprehensive mechanical, civil, and electrical upgrade of the Beaver Ruin Diversion Pump Station located in Lawrenceville, GA. The work includes replacing three grinder units, installing new rail systems, upgrading slide‑gate actuators, raising concrete wet‑well baffle walls, relocating flushing systems, and installing new electrical conduit and motor‑control center equipment. The contract will be awarded through a sealed‑bid competitive process, with bids due in late September and the completed work required within 450 days of contract start.
• Replace and install three new grinder units with associated rail and control systems.
• Upgrade influent and effluent slide‑gate actuators (total of six gates plus additional wet‑well gates).
• Perform civil modifications – raise baffle walls, platforms, and relocate flushing infrastructure.
• Install new electrical conduit, wiring, and Motor Control Center (MCC) as per design.
• All bidders must purchase the full set of drawings/specifications ($250 fee) and may attend an optional pre‑bid conference on 1 Sept 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.