Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Shadow Mountain Water System Project (Water Main and…

Cowlitz County·Washington

Shadow Mountain Water System Project (Water Main and Booster Pump Station)

Closes 9/28/2026$800k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Cowlitz County Department of Public Works is soliciting sealed bids for the design‑build construction of a new water distribution system on Shadow Mountain Road in Toutle, WA. The scope includes installing approximately 1,800 linear feet of water mains of varying diameters (12", 8", and 4"), constructing a county‑provided booster pump station with associated mechanical, electrical, and control work, and providing domestic service connections and fire hydrants. Bidders must review plans and specifications available through the Builders Exchange of Washington (BXWA) and submit a sealed bid package with a 5% bid deposit by the deadline. • 62 ft of 12″ water main, 1,050 ft of 8″ water main, 670 ft of 4″ future reservoir fill line • Installation of a booster pump station (mechanical, electrical, controls) • Domestic service connections and fire hydrants • Required on‑site pre‑bid walk‑through on 9/15/2026 (highly recommended) • Sealed bids due 9/28/2026 1:30 PM at the County Engineer’s office, Kelso, WA • Bid deposit equal to 5 % of bid amount required • All documents free to view/download via BXWA (registration required)

Attached files

Contact

Susan Eugenis(County Engineer)

Key dates

Opened
9/3/2026
Pre-bid meeting
9/15/2026
Closes
9/28/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
95052

Budget estimate

$800,000 – $2,000,000

No contract value is disclosed in the solicitation. Based on typical industry costs—approximately $350‑$500 per linear foot for 8″‑12″ water mains, $150‑$300 per foot for 4″ lines, plus $500,000‑$1,000,000 for a booster pump station and ancillary work—the total project cost is likely in the $1 million to $2 million range. Therefore, the winning contractor could expect a budget roughly between $800,000 (lower‑end estimate) and $2,000,000 (upper‑end estimate). Factors influencing the final amount include exact material prices, site conditions, and any required addenda.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Edgewater, FL·Florida

Top match · 70%

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

U.P. Engineers & Architects, Inc·Michigan

69% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Citrus County - Board of County Commissioners·Florida

69% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

U.S. Bureau of Reclamation·United States of America

69% match

WaterSMART Drought Response Program

Closes 10/2/2031Opened 3/5/2026

City of Piqua·Ohio

69% match

CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3

Closes 11/19/2026Opened 10/11/2026

Town of Lexington·South Carolina

69% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

California Grants·California

69% match

The Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Proposition 1) SMMC Grant Program

Rolling / TBD closeOpened 6/11/2025

City of Stillwater·Oklahoma

68% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

U.S. Bureau of Reclamation·United States of America

68% match

WaterSMART Enhancing Water Resources Projects

Closes 9/8/2027Opened 5/14/2026

Town of Eatonville·Florida

68% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Alaska Department of Environmental Conservation·Alaska

68% match

Ketchikan Lakes Alternative Raw Water Supply Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/11/2026

U.S. Bureau of Reclamation·United States of America

68% match

WaterSMART Cooperative Watershed Management Program

Closes 2/15/2028Opened 6/10/2026

Santa Maria-Bonita School District·California

68% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Tacoma·Washington

68% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 10/2/2026

Department of Buildings & General Services·Vermont

68% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Agriculture·Wyoming

68% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 11/17/2026Opened 9/30/2026

City of Piqua·Ohio

67% match

24-17.3 - Drake Road Water Booster Pumping Station

Closes 11/18/2026Opened 10/11/2026

The Metropolitan Water District of Southern California·California

67% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Tacoma·Washington

67% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 9/30/2026

City of Alexandria·Louisiana

67% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

U.S. Bureau of Reclamation·United States of America

67% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

City of Hickman, Nebraska·Nebraska

67% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Health And Human Services·South Dakota

67% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Bellevue·Washington

67% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026