The Drowning Creek Water and Sewer Project is a major infrastructure upgrade in Gwinnett County, GA, requiring the installation of new ductile‑iron water and gravity sewer mains, de‑commissioning of an existing pump station, and extensive roadway, erosion‑control, and site‑restoration work. The contractor must provide all materials, including DIP pipe, valves, fire hydrants, manholes, and steel casings, and must comply with detailed Georgia O.C.G.A. specifications, environmental permits, and a 520‑day schedule for substantial completion. This is a sealed‑bid, competitive procurement open to pre‑qualified firms.
• Install ~9,000 LF of 16‑in. (and smaller) ductile‑iron water main.
• Install ~12,500 LF of 24‑in. (and smaller) ductile‑iron gravity sewer main, including manholes, valves, and fire hydrants.
• De‑commission Harbins Landing Pump Station and restore roadway, sidewalks, curbs, and wetlands.
• Provide comprehensive traffic‑control, erosion‑control, and stream‑crossing solutions.
• Must be pre‑qualified for both water‑ and sewer‑portions and meet a 520‑day construction schedule.