This solicitation calls for a comprehensive upgrade of Sewage Pump Station No. 1044 in Miami, FL. The contractor must provide all labor, materials (except those supplied by the County), equipment, tools, and services to replace the existing submersible pumping station, including demolition, new construction, installation of mechanical and electrical systems, and site restoration. A continuous by‑pass pumping capability must be maintained throughout construction, and a Maintenance‑of‑Traffic (MOT) plan is required. The project is valued at approximately $1.37 M and must be completed within 270 calendar days.
• Provide site preparation, demolition of existing wet‑well/dry‑well, removal of old pumps, valves, SCADA panels, and associated infrastructure.
• Install two new 45 HP duplex submersible pumps, new concrete structures, valve vaults, pipe (6‑in. & 8‑in. ductile‑iron), electrical service, control panels, and related equipment.
• Design, obtain approval for, and execute a MOT plan; manage uninterrupted by‑pass pumping; conduct testing, start‑up, and final restoration of the site.