The City of Farmington is seeking a general contractor to construct Phase 2 of the Boundless Journey Adventure Park, a multi-phase, all-abilities park. The project includes demolition, grading, concrete pavement, concrete retaining walls, play equipment, play area surfacing, irrigation, planting, landscape mulches, site furnishings, fencing, rammed earth walls, site electrical and lighting. The project is funded by Regional Recreation Centers – Quality of Life, HUD, and CDBG Grants. The contractor shall provide all labor, materials, tools, equipment, supervision, and other related items required to complete the project as per scope of work, specification, and drawings prepared by Pland Collaborative Landscape Architecture.
• The project area is divided into 6 sections, with Sections 1-4 being the base bid and Sections 5 and 6 being additive alternates.
• The project requires compliance with all applicable laws, regulations, and grant requirements.
• The contractor must provide a bid bond, performance bond, and labor, material, and tax payment bond.
• The contractor must comply with all safety and labor standards, including the Construction Safety Act and the Williams-Steiger Occupational Safety and Health Act of 1970.