Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Eagle Mountain Spillway Guardrail Height Adjustment

Tarrant Regional Water District·Texas

Eagle Mountain Spillway Guardrail Height Adjustment

Closes 10/20/2026$800k – $1.2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Tarrant Regional Water District (TRWD) is soliciting qualified contractors to adjust the existing metal‑beam guardrail along the Eagle Mountain spillway roadway to a uniform height of 28 inches, preserving serviceable components and ensuring compliance with TxDOT standards. The work covers approximately 6,200 linear feet of guardrail, requiring field verification, rail raising, post adjustments or replacements, hardware replacement, traffic control, and final inspection. Bidders must attend a mandatory pre‑proposal meeting on October 8, 2026, submit questions by October 14, 2026, and deliver a lump‑sum proposal by October 20, 2026. The contract award is expected November 17, 2026. • Adjust existing guardrail to 28‑inch height, retaining usable posts and rails. • Perform pre‑construction inspection, document existing conditions, and identify needed replacements. • Provide all labor, equipment, traffic control, and materials (galvanized where required). • Submit a single PDF proposal with price, project approach, references, timeline, and required forms (bid bond, insurance, etc.). • Mandatory pre‑proposal meeting on 10/8/2026; questions due 10/14/2026; proposal due 10/20/2026. • Estimated quantity: ~6,200 linear feet; pricing per linear foot plus separate unit items for replacement components. • Evaluation based on price (40%), approach (30%), references (20%), and timeline (10%).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Buckley Butler

[email protected]

(903) 432-2814

Key dates

Opened
9/23/2026
Questions due
10/14/2026
Pre-bid meeting
10/8/2026Mandatory
Closes
10/20/2026
Projected award
11/17/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
26-185

Budget estimate

$800,000 – $1,200,000

The RFP does not disclose a budget. Based on the scope—approximately 6,200 linear feet of guardrail adjustment—and typical industry rates for guardrail height modification (roughly $120‑$200 per linear foot including labor, equipment, traffic control, and minor hardware), the total contract value is estimated between $750,000 and $1,240,000. Additional costs could arise from replacing damaged posts, rails, or hardware, which would push the high end upward. Therefore a reasonable budget range is $800,000 – $1,200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Chittenden·Vermont

Top match · 63%

Guardrail Replacement

Closes 11/19/2026Opened 10/16/2026

City of Danville·Virginia

63% match

IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Agriculture·Utah

62% match

GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

Closes 11/20/2026Opened 10/5/2026

New York State Thruway Authority - Procurement Services·New York

62% match

Elevator Maintenance on the Governor Mario M. Cuomo Bridge for NY Division

Closes 11/30/2026Opened 9/25/2026

Tarrant Regional Water District·Texas

62% match

Eagle Mountain Office - Fence and Gate Additions for Fuel Island Project

Closes 11/3/2026Opened 10/13/2026

State of Delaware NAT·Delaware

62% match

Ted Harvey Conservation Area Viewing Platforms

Closes 11/5/2026Opened 10/1/2026

Town of Glover·Vermont

61% match

Glover Guardrail Repairs

Closes 11/24/2026Opened 10/20/2026

Massachusetts Department of Transportation·Massachusetts

61% match

616377 DISTRICT 1 Scheduled and Emergency Guardrail and Fence Repairs at Various Locations on I-90

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of The Interior·Minnesota

61% match

Y--MN FERGUS FALLS WMD HANDRAIL STAIRS

Closes 11/13/2026Opened 10/27/2026

U.S. Department Of Defense·Oregon

61% match

W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning

Closes 11/5/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

61% match

Provide Guard Tower & Lower Perimeter Fence Modifications

Closes 11/18/2026Opened 9/23/2026

Virginia Department of Transportation·Virginia

61% match

P89_2027 ON-CALL GUARDRAIL HITS REPAIR

Closes 11/18/2026Opened 10/27/2026

City of Carlsbad·California

61% match

Paseo Del Norte Guardrail

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Transportation·New Jersey

61% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

City of Cedar Rapids·Iowa

61% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

Village of Cary·Illinois

61% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

U.S. Department Of Defense·Washington

61% match

Sources Sought: Albeni Falls Dam Spillway Gate Replacments

Closes 4/29/2028Opened 4/17/2025

U.S. Department Of The Interior·Utah

61% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

U.S. Department Of Transportation·Washington

60% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/13/2026Opened 9/30/2026

Department of Natural Resources·Minnesota

60% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

60% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

60% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Oregon Marion County·Oregon

60% match

ITB - Construction of the Timber Trail Guardrail

Closes 11/3/2026Opened 10/12/2026