Colby Community College is seeking a qualified low‑voltage contractor to design, install, test, and document a Phase I fiber‑optic network that connects the main distribution frame in the Library to four intermediate distribution frames across campus buildings. The contractor must provide all materials (24‑pair armored single‑mode fiber, termination hardware, fire‑stop sleeves, labeling, etc.), perform full optical testing, and deliver comprehensive as‑built documentation and warranties. The work must be completed within a four‑month window after award, with weekly progress updates and strict price fixation through the project’s end.