Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Hampshire
  4. ›Construction
  5. ›Cheshire Rail Trail Fitzwilliam Segment Trail Work

Cheshire County·New Hampshire

Cheshire Rail Trail Fitzwilliam Segment Trail Work

Closes 5/20/2026$80k – $100kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Cheshire is seeking qualified contractors to perform trail rehabilitation on a 4.7‑mile segment of the Cheshire Rail Trail through Fitzwilliam, NH. Work includes clearing debris from the trail, ditches, and 18 culverts; deepening ditches to ensure drainage; filling holes and gaps; and resurfacing the trail bed with specified hard‑pack material. The contract is cost‑plus‑materials with a total ceiling of $100,000 (80% reimbursable, 20% in‑kind contribution) and must be completed between July 1 2026 and December 15 2026 (optional extension to April 1 2027). • Clear all vegetation, leaves, debris, and loose material from the trail corridor, ditches, and culverts. • Deepen ditches 1‑2 ft and ensure drainage for a minimum two‑year period. • Clean 18 existing culverts; no replacement required. • Refill holes/gaps and apply a 4‑inch hard‑pack wearing surface (NHBOT 304.7) across the 12‑ft wide trail. • Provide detailed cost breakdown, labor rates, equipment list, subcontractor disclosures, and required certifications (Davis‑Bacon, SAM registration, licensing, insurance).

Attached files

Contact

Suzanne Bansley(Grants Manager)

[email protected]

(603) 355-3023

Key dates

Opened
4/13/2026
Questions due
5/5/2026
Closes
5/20/2026
Projected award
6/5/2026
Duration
5 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237990

Budget estimate

$80,000 – $100,000

The solicitation caps the contract at $100,000 total, with $80,000 reimbursable and a $20,000 in‑kind contribution. Assuming the contractor can secure the full reimbursable portion, the expected earnings range is roughly $80 K to $100 K. This estimate reflects the stated price limit and typical cost structures for trail rehabilitation (labor, equipment, material, and testing).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Department of Transportation·Virginia

Top match · 67%

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

County of Chester·Pennsylvania

65% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026

City of Green Bay·Wisconsin

65% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Connecticut Town of Simsbury·Connecticut

64% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Maryland Department of Natural Resources·Maryland

64% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Kenosha County·Wisconsin

63% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Environmental Conservation, NYS Department of·New York

63% match

2027 Cold River Horse Trail Backcountry Maintenance

Closes 11/18/2026Opened 10/14/2026

Haines Borough·Alaska

63% match

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026

City of Keene·New Hampshire

63% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Fresno·California

62% match

River West Fresno Eaton Trail Extension Phase 1

Closes 11/20/2026Opened 10/21/2026

City of Lincoln·California

62% match

Trail Maintenance RFP

Closes 11/13/2026Opened 10/21/2026

Delaware County·Pennsylvania

62% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

Cobb County·Georgia

62% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Connecticut City of Middletown·Connecticut

62% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Maryland Howard County Government·Maryland

62% match

IFB-2027-19 PATUXENT BRANCH TRAIL IMPROVEMENTS

Closes 12/23/2026Opened 10/24/2026

City of Middletown·Connecticut

62% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Gainesville - Procurement Division·Florida

61% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Goshen, Indiana·Indiana

61% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

South Carolina Forestry Comm·South Carolina

61% match

WAMBAW TRAIL MAINTENANCE AND GROOMING

Closes 11/5/2026Opened 10/14/2026

Howard County, Office of Procurement·Maryland

61% match

Patuxent Branch Trail Improvements

Closes 12/23/2026Opened 10/23/2026

City of Centerville, OH·Ohio

61% match

Iron Horse Trail Resurfacing

Closes 11/5/2026Opened 10/22/2026

Illinois Natural Resources·Illinois

61% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

NYS Paul Smith's College of Arts and Sciences·New York

61% match

TRAIL MAP OF THE VISITOR INTERPRETIVE CENTER PROPERTY

Closes 12/1/2026Opened 10/30/2026

City of Cincinnati·Ohio

61% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Cincinnati·Ohio

61% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026