Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Water and Wastewater
  5. ›2-INCH GALVANIZED WATER MAIN REPLACEMENTS LITTLE ROCK 2026…

Central Arkansas Water·Arkansas

2-INCH GALVANIZED WATER MAIN REPLACEMENTS LITTLE ROCK 2026 PHASE 2

Closes 8/25/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Central Arkansas Water is seeking qualified contractors to replace and install new water mains throughout Little Rock as part of Phase 2 of its 2026 water infrastructure upgrade. The scope includes removal of existing 2‑inch galvanized pipe and installation of approximately 900 linear feet of new 8‑inch ductile‑iron pipe, 3,390 linear feet of 6‑inch ductile‑iron pipe, and 6,040 linear feet of 3‑inch PVC pipe across a wide range of city streets. Bidders must obtain the full contract documents, be listed on the plan‑holders list, and submit a sealed bid with a bond equal to at least 5 % of the total bid amount. A pre‑bid conference is scheduled, and all questions should be directed to the primary contact. • Total new water‑main length: ~10,330 LF (combined iron and PVC) • Key locations: Indian Trail, Cantrell Rd., N. Arthur St., Winwood Rd., N. Grandview St., Scenic Dr., etc. • Bid bond requirement: minimum 5 % of total bid value • Pre‑bid conference: Aug 18, 2026 (strongly encouraged) • Bid deadline: Aug 25, 2026, 10:00 AM

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Thomas Wray

[email protected]

(501) 377-1221

Key dates

Opened
8/2/2026
Pre-bid meeting
8/18/2026
Closes
8/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Central Arkansas Water Job No. 09608

Budget estimate

$1,000,000 – $3,000,000

No contract value is disclosed. Based on typical costs for ductile‑iron and PVC water‑main construction (roughly $150–$300 per linear foot for iron and $50–$100 per foot for PVC), the 10,330 LF of combined pipe could translate to a contract value in the low‑ to mid‑million‑dollar range. Assuming mid‑range material and labor costs, a reasonable estimate is between $1 million and $3 million. Factors influencing the final amount include exact material specifications, site conditions, and any ancillary civil works.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bellevue·Washington

Top match · 74%

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Goodwyn Mills Cawood·Georgia

73% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Georgia City of Cartersville·Georgia

72% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Charlotte·North Carolina

72% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

72% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of DeLand·Florida

71% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Agriculture·Utah

71% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

71% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Arkansas

71% match

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

City of Riverside·California

70% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Grand Forks, North Dakota·North Dakota

70% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

Western Virginia Water Authority·Virginia

70% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Gwinnett County Government·Georgia

70% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

Massachusetts Town of Westborough·Massachusetts

69% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Oregon

69% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of Lake City and City of Bellechester·Minnesota

69% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

City of Rockford·Illinois

69% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Georgia Gwinnett County·Georgia

69% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Gwinnett County Government·Georgia

69% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

City of Edgewater, FL·Florida

69% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Ontario·California

69% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Northern Kentucky Water District·Kentucky

68% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Gwinnett County Government·Georgia

68% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

City of Rockford·Illinois

68% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Town of Upton·Wyoming

68% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026