The project involves the supply, installation, and commissioning of three high-efficiency Variable Air Volume (VAV) Rooftop Packaged Units (RTUs) at the Phora Facility. The new units must meet or exceed the technical specifications outlined in the Performance Work Statement (PWS). The project includes removal and responsible disposal of the old units, installation of new units with all associated mechanical, electrical, and control connections, and comprehensive commissioning and training for facility staff. Key features of the new units include a minimum AHRI IEER of 18.7, a cooling total capacity of 139,200 BTU/hr, and a primary heating capacity of 95,400 BTU/hr.
Some of the key requirements of the project include:
• Demolition and removal of existing units
• Supply and installation of new rooftop packaged units
• Commissioning and handover of the new units
• Protection and clean-up of the site
• Compliance with all relevant international and local codes and standards
• Provision of material certifications for all major components
• Conducting performance and safety testing as specified
• Submission of as-built documentation and test reports upon completion
The project is expected to be completed within 120 calendar days from the date of contract award, subject to weather and site conditions.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.