Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Waste Removal and Collection
  5. ›LATERAL LINING - CENTER STREET CORRIDOR

Loxahatchee River District·Florida

LATERAL LINING - CENTER STREET CORRIDOR

Closes 12/16/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Loxahatchee River District is seeking qualified contractors to furnish all labor and materials necessary to complete cured-in-place lateral lining for the laterals within the Center Street Corridor area. The contractor should assume that the clean-outs do not exist and intend to install cured-in-place lateral lining without a clean-out. Any clean-outs installed must be installed per District Standards without exception. All work must be in compliance with the solicitation documents, the Loxahatchee River District Manual of Minimum Construction Standards and Technical Specifications, and all applicable local, state, and federal laws and regulations. • The project involves cured-in-place lateral lining for the laterals within the Center Street Corridor area. • The contractor must comply with the solicitation documents, the Loxahatchee River District Manual of Minimum Construction Standards and Technical Specifications, and all applicable local, state, and federal laws and regulations. • The project requires the installation of cured-in-place lateral lining without a clean-out, unless otherwise specified. • The contractor must ensure that all work is completed in accordance with the Occupational Safety and Health Act Administration (OSHA) and all costs of permits and regulatory compliance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sharyn Allen(Purchasing Agent)

[email protected]

(561) 401-4026

Key dates

Opened
10/27/2025
Closes
12/16/2025

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
ITB-25-010-00149-REBID-0-2026/SA

Budget estimate

$500,000 – $2,000,000

The estimated budget for this project is difficult to determine due to the lack of information on the project's budget. However, based on the scope of work, which involves cured-in-place lateral lining for the laterals within the Center Street Corridor area, the budget could range from $500,000 to $2,000,000. This estimate is influenced by the complexity of the project, the materials required, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of San Luis Obispo·California

Top match · 60%

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Charlotte·North Carolina

60% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charleston, WV·Virginia

59% match

Capital Connector Construction Project

Closes 12/3/2026Opened 10/5/2026

LA Public Works Engineering Bureau·California

59% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Sacramento·California

59% match

Envision Triangle Space

Closes 11/4/2026Opened 10/19/2026

Houston-Galveston Area Council·Texas

58% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Austin·Texas

58% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Chittenden County Regional Planning Commission·Vermont

58% match

RFP Shelburne Road Center Plan

Closes 11/20/2026Opened 10/23/2026

Virginia Department of Transportation·Virginia

58% match

B11_2027 SMART SCALE CORRIDOR IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

Texas Houston-Galveston Area Council·Texas

58% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

Ohio Department of Transportation·Ohio

58% match

D08-RFQ-2143 Tunnel Liner

Closes 11/10/2026Opened 10/27/2026

City of Charlotte·North Carolina

58% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

North Carolina City of Raleigh·North Carolina

58% match

Capital Boulevard Corridor Design

Closes 11/13/2026Opened 10/6/2026

City of Charlotte·North Carolina

58% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

New Orleans Regional Transit Authority·Louisiana

58% match

Tree Cutting Streetcar Line & Vegetation Clearance

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

57% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of Hampton·Virginia

57% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of The Colony·Texas

57% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Harrisonburg·Virginia

57% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Charlotte·North Carolina

57% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Ridgeland·Mississippi

57% match

West Jackson Street Corridor Demonstration Project

Closes 11/6/2026Opened 10/16/2026

City of Charlotte·North Carolina

57% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

The City of Columbus·Ohio

57% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

City of Charlotte·North Carolina

57% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

State of Delaware DOT·Delaware

57% match

OPEN END- PATCHING AND THIN OVERLAY, CENTRAL DISTRICT, FY 26 - 29

Closes 11/10/2026Opened 10/13/2026