Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Waste Removal and Collection
  5. ›6.26 - City of Newburgh Combined Sewer Control Facility…

New York

6.26 - City of Newburgh Combined Sewer Control Facility Project

Closes 8/6/2026$10M – $20MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Newburgh is soliciting formal bids for the design‑build construction of a Combined Sewer Control Facility, including screening, flow control, chemical dosing, odor control, SCADA integration, and associated site utilities. The scope also covers an influent sewer with a railroad crossing, structural piers, a new concrete energy dissipation structure, and related civil works. Bids are to be submitted physically, with separate contracts for general construction, electrical, plumbing, and HVAC. The project is expected to last two years (730 days) and requires comprehensive labor, materials, equipment, and incidentals. • Construct a combined sewer control facility featuring screening, flow control, chemical storage/dosing, odor control, ductwork, chlorine contact tank, outfall sewer, plumbing, HVAC, electrical, and SCADA systems. • Build an influent sewer including a railroad crossing, structural support piers, site work, and a concrete energy dissipation structure. • Separate bid packages for General Construction (1G), Electrical (1E), Plumbing (1P), and HVAC (1H). • Physical bid submission required by August 6, 2026; questions due by July 10, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
6/5/2026
Questions due
7/10/2026
Closes
8/6/2026
Duration
730 days

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
Reference Number: 0000426644

Budget estimate

$10,000,000 – $20,000,000

No contract value is disclosed, but a combined sewer control facility of this magnitude typically ranges from $10 million to $20 million based on comparable municipal infrastructure projects, regional labor rates, and the inclusion of multiple trade contracts (general, electrical, plumbing, HVAC). The estimate assumes standard design‑build pricing for civil, mechanical, and electrical scopes in the Northeastern U.S.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Erie County·New York

Top match · 75%

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

City of Opa-locka·Florida

74% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

City of Independence·Missouri

74% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

City of Ann Arbor·Michigan

74% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

NYS Allegany County·New York

73% match

Allegany County – Sewer System Improvements

Closes 11/12/2026Opened 10/7/2026

Hastings Utilities·Nebraska

73% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Cleveland·Ohio

73% match

120-26 - Constructing & Installing Replacement Sewers & Repairing & Rehabilitation of Existing Sewers

Closes 12/2/2026Opened 10/29/2026

City of Lynchburg·Virginia

73% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

73% match

SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the Guy R Brewer Trunk sewer

Closes 7/31/2030Opened 8/5/2026

Brazos Valley·Texas

73% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Lynchburg·Virginia

73% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Connecticut Town of Fairfield·Connecticut

73% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Maryland Baltimore County Government·Maryland

73% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

Maryland Baltimore County Government·Maryland

73% match

RFB B-10000565 Chemical Root Control, Sewer Treatments, term Contract

Closes 11/17/2026Opened 10/10/2026

New York City Department of Design and Construction·New York

73% match

SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the GUY R BREWER Trunk sewer

Closes 7/31/2030Opened 7/10/2026

City of Elgin·Illinois

73% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

Baltimore County, Maryland·Maryland

73% match

CHEMICAL ROOT CONTROL, SEWER TREATMENTS, TERM CONTRACT

Closes 11/17/2026Opened 10/8/2026

City of Cleveland·Ohio

72% match

115-26 - Luther Avenue Sewer Project

Closes 11/11/2026Opened 10/16/2026

Brazos Valley·Texas

72% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

New York City Department of Environmental Protection·New York

72% match

82626B0065-BEDC - CSO-GC-SFS-OH-CP3 Construction of CSO Facilities for Gowanus Canal

Closes 11/17/2026Opened 9/30/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

72% match

Full Document: Request for Proposals. Sewer Utility Superintendent & Engineering Consultant 2026-2027

Closes 11/13/2026Opened 10/29/2026

City of Rosenberg·Texas

72% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Elgin·Illinois

72% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Albany·Georgia

72% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of West Des Moines·Iowa

72% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026