The Bureau of Reclamation is seeking a contractor to perform Horizontal Directional Drilling (HDD) for the NGWSP Block 2-3 pipeline alignment. The project includes HDD for 42-inch and 36-inch buried water transmission pipelines at various locations. The contractor will be required to provide a Quality Control Plan, conduct quantity surveys, and perform other construction-related tasks. The project is expected to last 834 days, and the contractor must begin performance within a certain timeframe after award.
• The project involves HDD for water transmission pipelines
• The contractor must provide a Quality Control Plan
• Quantity surveys are required for payment verification
• The project is expected to last 834 days
• The contractor must begin performance within a certain timeframe after award