The City of Huntsville is seeking a qualified engineering firm to develop design plans and specifications for a drainage improvement project at 3391 Autumn Road. The project involves replacing an existing 75-inch diameter railroad tank car culvert with a properly sized concrete box culvert, aligning it with the downstream channel to improve flow conveyance. The selected firm will be expected to perform all tasks necessary to produce biddable construction plans and specifications for the culvert replacement and to assist the City in meeting all GLO grant requirements.
• The project is funded by a grant from the Texas General Land Office (GLO) under the Regional Mitigation Program (RMP).
• The City is seeking engineering design services for the drainage project.
• The firm selected will be expected to perform site investigation and analysis, hydraulic and hydrologic analysis, preliminary and final design, environmental coordination, and deliverables.
• The project goal is to mitigate flooding and drainage issues in the Spring Lake area by increasing the capacity of the Autumn Road crossing and improving the efficiency of the drainage channel.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.