The City of Saco is seeking a qualified contractor to replace the sludge discharge pipe on its 75‑foot secondary clarifier, including removal and re‑assembly of the clarifier components, procurement and installation of a new Ovivo‑manufactured pipe and associated couplings, surface preparation, epoxy coating, and replacement of hardware with stainless‑steel components. The contractor must also provide a portable toilet for the site, power‑wash the work area, and perform cleanup. The work must be completed within a four‑week period after contract start.
• Supply and install new sludge discharge pipe (Ovivo) and coupling, pre‑painted with Tnemec epoxy.
• Disassemble, clean, and re‑assemble all clarifier elements (walkway, cages, feedwell, draft tubes, skimmer, etc.).
• Replace removed hardware with new SS304 parts, repaint disturbed areas, and ensure final site cleanup.
Attached files
Contact
Howard Carter(Director, Water Resource Recovery Department)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.