The Confederated Tribes of the Colville Reservation are seeking a qualified contractor to install a complete kelt‑reconditioning system inside an existing steelhead juvenile acclimation facility. The Tribe will supply all tanks, degassing tower, and SCADA hardware; the contractor’s responsibility is to perform all installation work, including civil excavation, dry‑well construction, pipe and valve installation, equipment anchorage, utility coordination, and final system testing. The project must start by June 2026 and be finished by December 2026, with strict adherence to Tribal building codes, water‑resource protection, and TERO employment requirements.
• Install four 4‑ft quarantine tanks, four 4‑ft circular tanks, and two 10‑ft circular tanks (all supplied by the Tribe).
• Install a degassing control tower, pre‑cast dry‑well, associated piping, raceway covers, and a new SCADA control system.
• Protect existing water, drainage, and electrical utilities; provide ≥48‑hour notice for any work affecting those systems; coordinate closely with the hatchery manager.
• Deliver a detailed schedule, itemized cost proposal, and compliance documentation (Indian Preference, TERO certification, insurance, bond/retainage).