Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Architecture
  5. ›Construct New Research Building for Graduate Research and…

NYS State University Construction Fund·New York

Construct New Research Building for Graduate Research and AI Institute – Phase 1

Closes 10/15/2026$3M – $6.5MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Construct New Research Building for Graduate Research and AI Institute – Phase 1 project at the State University of New York at Binghamton. The Project will construct phase 1 of a new, approximately 35,000 GSF, multi-story building to serve as a collaborative hub for researchers from disparate disciplines such as engineering, sciences, arts, and humanities. The building will house research activities that lead to innovative technology and explore society’s connection with technologies such as artificial intelligence (AI) and robotics, biotechnology, microelectronics, and clean energy. The building will promote a sense of connectivity through these collaborations, connecting the University’ s research community with each other and with the region’s communities. Phase 1 of this project will focus on graduate research and artificial intelligence by creating a new AI Center with dry labs, collaboration spaces, and faculty support spaces. The site for this new multi-story research facility is on the south side of campus, along the East/West Drive, opposite Bartle Library. This area is currently used as a visitors parking lot and is adjacent to lot W. Utilities required and located nearby include water, sanitary lines, storm water drainage, telecom, and electrical. All utilities require investigation. An embedded program study will be required for this project for the phase 1 building. The available budget will determine the building’s final square footage and programmatic elements, which may result in a different footprint than outlined above. The Fund is considering employing the Construction Manager as Constructor (CMAC) delivery method for this project. The construction value is estimated to be approximately $64,993,000. Consultants are required to register for this procurement opportunity on the Fund’s website at: https://sucf.suny.edu/design-consulting-services/procurements-advertised Once registered, consultants will receive an email with the applicable Request for Qualifications (RFQ) and the link to upload your Statement of Qualifications (SOQ) at the submission deadline. To register your firm, please “click” on the link Request RFQ Format. Please complete the registration form and then “click” Submit Registration. Once your registration is submitted, you will receive a confirmation number and the RFQ via email. Should you experience any issues with registering, email your request to: [email protected] SOQs must be submitted in the format prescribed by the Fund using the link provided in the email received after registration that supplies the RFQ. Required electronic copies of Statements of Qualifications (SOQs) must be received by the due date and time specified in the RFQ. Paper or emailed copies of SOQs will not be accepted. In accordance with State Finance Law §139-j and §139-k, all inquiries regarding this procurement can only be made to: · Samantha Lord · Nora Kanarkiewicz · Jeremy Clausi · Kelly Whitbeck M/WBE SDVOB Issues Only · Scott Clay · Joanne Lovelady · Joseph Francis Any questions regarding this procurement should be emailed to: [email protected]. For questions related to M/WBE SDVOB, please email: [email protected]. Failure to adhere to this provision may result in the disqualification of your firm under the NYS Procurement Lobbying Act. For more information on the Procurement Lobbying Act, please refer to the Fund’s website at https://www.sucf.suny.edu/business/ppolicy.cfm. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Nora Kanarkiewicz(Procurement Assistant)

[email protected]

(518) 320-1639

Key dates

Opened
9/17/2026
Closes
10/15/2026
Duration
60 months

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541310
Solicitation №
071097-00

Budget estimate

$3,000,000 – $6,500,000

The advertised construction value is about $64,993,000. Architectural/engineering consulting fees for a project of this size typically range from 4 % to 10 % of construction cost, depending on scope and firm reputation. Applying that range yields an estimated consultant fee between roughly $2.6 M and $6.5 M. A mid‑range assumption (~6 %) suggests around $3.9 M. Factors influencing the final budget include the final square‑footage (budget‑driven), the extent of utility investigation required, and any additional program‑study services.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. National Science Foundation·United States of America

Top match · 70%

Mid-scale Research Infrastructure-1

Closes 2/8/2027Opened 8/20/2024

U.S. Department Of Defense·United States of America

70% match

Market Intelligence - Progressive Design-Build - Blood Donation Center

Closes 11/9/2026Opened 10/23/2026

The University of North Carolina·North Carolina

69% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

New Mexico State University·New Mexico

69% match

CMAR 5297 I.D.E.A.L. Research Facility

Closes 11/2/2026Opened 10/9/2026

North Carolina Robeson Community College·North Carolina

69% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

U.S. Department Of Defense·New York

69% match

ADVANCED RESEARCH ANNOUNCEMENT (ARA) TITLE: ADVANCED TRACKING ARCHITECTURE USING AI (ATA-AI)

Closes 7/13/2029Opened 7/16/2024

Texas A&M University System·Texas

69% match

AE RFQ - West Campus Vivarium - College Station, Texas

Closes 11/10/2026Opened 10/13/2026

Shawnee State University·Ohio

68% match

Technology Innovation Lab – Kricker Innovation Hub

Closes 11/4/2026Opened 10/7/2026

Virginia Polytechnic Institute and State University·Virginia

68% match

VT Forestry Research Operations Center

Closes 11/23/2026Opened 10/30/2026

U.S. National Institutes of Health·United States of America

68% match

Bridge2AI Network for AI Health Science

Closes 2/28/2027Opened 7/8/2026

U.S. Department Of Defense·New York

68% match

ADVANCED RESEARCH ANNOUNCEMENT (ARA) TITLE: ADVANCED TRACKING ARCHITECTURE USING AI (ATA-AI)

Closes 7/13/2029Opened 7/29/2026

Oregon Health and Science University·Oregon

68% match

Joint Architectural / Engineering and Construction Manager / General Contractor

Closes 11/3/2026Opened 1/1/2017

James Madison University·Virginia

68% match

JMU-P3-2026 Detailed Phase

Closes 11/16/2026Opened 9/15/2026

Clemson University·South Carolina

68% match

Johnstone Site Housing

Closes 11/18/2026Opened 10/22/2026

Northeastern Illinois University·Illinois

68% match

Invitation for Construction Bid: Integrated Bioprocessing Research Laboratory Add

Closes 11/4/2026Opened 10/1/2026

Texas A&M University System·Texas

68% match

AE RFQ - Virtual Production Institute Fort Worth - Fort Worth, TX

Closes 11/17/2026Opened 10/20/2026

City of Roswell·New Mexico

68% match

First Responder Campus

Closes 11/17/2026Opened 10/15/2026

NYS State University Construction Fund·New York

67% match

Renovate Plant Science Building - Phase 2

Closes 11/10/2026Opened 10/13/2026

U.S. Office of Science·United States of America

67% match

The Genesis Mission: Transforming Science and Energy with AI

Closes 12/17/2026Opened 3/17/2026

North Carolina State University·North Carolina

67% match

NC State University

Closes 11/4/2026Opened 10/6/2026

U.S. Office of Naval Research·United States of America

67% match

Fiscal Year (FY) 2027 Department of War Multidisciplinary Research Program of the University Research Initiative (MURI)

Closes 4/9/2027Opened 9/21/2026

North Carolina Randolph Community College·North Carolina

67% match

AI2C Building Renovation Commissioning Services

Closes 11/10/2026Opened 10/27/2026

The University of North Carolina·North Carolina

67% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

North Carolina State University·North Carolina

67% match

NC State University

Closes 11/4/2026Opened 10/6/2026

University of Louisville·Kentucky

67% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026