Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›Additional Water Main River Crossing - Upland/Lambert…

City of Flagler Beach·Florida

Additional Water Main River Crossing - Upland/Lambert Avenue Portion

Closes 5/7/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flagler Beach is seeking bids for the construction of a new water main river crossing. The project includes the installation of approximately 2,800 linear feet of 16-inch diameter PVC water main, 75 water services, and seven fire hydrant assemblies. The project also involves the abandonment and deactivation of approximately 3,100 linear feet of existing 6-inch diameter water main, removal of three fire hydrants, and modification of 75 services and two valves. An additive alternate bid is also included for swale and culvert work. * Key aspects of the project include: * Construction of new water main and services * Abandonment and deactivation of existing water main * Fire hydrant installation and removal * Swale and culvert work (additive alternate bid) * Restoration of disturbed areas The project is expected to be completed within a few months, although the exact duration is not specified. The city is seeking a qualified contractor to perform the work, and bids are due by May 7, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Penny Overstreet(Main Contact)

[email protected]

Key dates

Opened
4/9/2026
Pre-bid meeting
4/14/2026
Closes
5/7/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
ITB-FB-2026-0705-1-2026/PO

Budget estimate

$1,000,000 – $5,000,000

Based on the scope of work, the estimated budget for this project is likely to be in the range of $1 million to $5 million. This estimate is based on the length of new water main to be installed, the number of services and fire hydrants, and the complexity of the work involved. The actual budget may vary depending on the bids received and the city's budget for the project. Factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as any additional work that may be required beyond the initial scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Riverside·California

Top match · 64%

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Hastings Utilities·Nebraska

64% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

U.S. Department Of Defense·Louisiana

63% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

City of Grand Rapids Department of Engineering·Michigan

63% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

Clermont County - Board of Commissioners·Ohio

63% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Catawba Regional Council of Governments·South Carolina

63% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of El Paso De Robles·California

63% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

NYS Alden, Town of·New York

62% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Louisiana

62% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Louisiana

62% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

Town of Eatonville·Florida

62% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Ontario·California

62% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

62% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

City of Lebanon·Indiana

62% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Florida Governmental Utility Authority·Florida

62% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Anderson, SC·South Carolina

62% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Oregon Tualatin Valley Water District·Oregon

61% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Austin·Texas

61% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

U.S. Department Of Defense·Louisiana

61% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

61% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025