Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›DJT Airfield Vault Building Expansion

Palm Beach County Department of Airports·Florida

DJT Airfield Vault Building Expansion

Closes 10/13/2026$400k – $600kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Palm Beach County Department of Airports is soliciting bids for the expansion of the existing airfield electrical vault at President Donald J. Trump International Airport. The project adds approximately 2,500 sq ft to the vault, includes interior renovation, roof replacement, upgrades to the HVAC and fire‑protection systems, and increases electrical capacity. Additional work involves relocating regulators, the ALCMS control system, fiber‑optic and power cabling, and an optional replacement of the standby emergency generator. The contract will be awarded to the lowest responsive and responsible bidder; all work must comply with federal, state and local regulations, including Davis‑Bacon, Buy‑America, and DBE requirements. Bidders must be properly licensed in Florida and provide a bid bond equal to 5 % of the bid price. • Scope: 2,500 sq ft vault expansion, interior fit‑out, roof replacement, HVAC & fire‑protection upgrades. • Electrical work: capacity increase, regulator & control system relocation, fiber‑optic & power cable routing. • Optional alternate: standby emergency generator replacement. • Mandatory compliance: Davis‑Bacon Act, Buy‑America, Title VI, OSHA, etc. • Bid documents available after September 7 2026; pre‑bid conference September 23 2026 (encouraged). • Bid submission deadline: October 6 2026, 2:00 PM (sealed bids). • Required bid bond: ≥5 % of bid price.

Attached files

Contact

Frederick Gaines(Buyer)

[email protected]

(561) 687-5944

Key dates

Opened
10/9/2026
Pre-bid meeting
9/23/2026
Closes
10/13/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
IFB-120-PB 26-12-8

Budget estimate

$400,000 – $600,000

Based on typical airport‑grade construction costs for specialized electrical vaults (approximately $150‑$250 per square foot) and the inclusion of interior finishes, roof systems, HVAC, fire‑protection upgrades, and electrical system relocation, the total contract value is estimated between $400,000 and $600,000. The lower end assumes modest material and labor rates; the higher end reflects premium specifications, the optional generator replacement, and compliance‑related overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fayetteville·Arkansas

Top match · 66%

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

City of Charlotte·North Carolina

65% match

Center Lighting Vault Relocation

Rolling / TBD closeOpened 3/15/2027

City of Fayetteville·Arkansas

65% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

York Technical College·South Carolina

65% match

YTC - Welding Expansion - Building D

Closes 11/12/2026Opened 10/9/2026

Delta Airport Consultants·Virginia

65% match

Quinton, VA - New Kent County Airport - Construct T-Hangars and Site (24052)

Rolling / TBD closeOpened 10/22/2026

York Technical College·South Carolina

65% match

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

Franklin County Board of County Commissioners·Florida

64% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

Delta Airport Consultants·Virginia

64% match

COMING SOON - Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 (20030)

Rolling / TBD closeOpened 5/1/2026

Delta Airport Consultants·Virginia

64% match

COMING SOON - Quinton, VA - New Kent County Airport - Construct T-Hangars (Site Prep) 24052

Rolling / TBD closeOpened 3/1/2026

Cincinnati/Northern Kentucky International Airport·Kentucky

63% match

Vault 12 and South ARFF Generator Upgrades

Closes 11/5/2026Opened 10/1/2026

City of Fayetteville, Arkansas·Arkansas

63% match

Bid 26-56, Construction – FYV Hangar Infrastructure Improvements Phase 2

Closes 11/3/2026Opened 10/11/2026

City of Prescott·Arizona

62% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Greater Orlando Aviation Authority·Florida

62% match

Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)

Closes 11/9/2026Opened 9/28/2026

City of St. Joseph·Missouri

62% match

D-1 Aircraft Hangar Lease

Closes 11/3/2026Opened 10/2/2026

City of Charlotte·North Carolina

62% match

Airport Surveillance Radar Relocation Construction

Rolling / TBD closeOpened 5/3/2027

Chesterfield County Airport·Virginia

62% match

Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 - Package 1 (20030)

Rolling / TBD closeOpened 10/22/2026

U.S. Department Of Defense·Maine

62% match

Maine Air National Guard Fuel Cell Hangar (FCH), Project No. FKNN159044

Closes 12/1/2026Opened 9/21/2026

City of Shawnee, Oklahoma·Oklahoma

61% match

Shawnee Regional Airport | 24747-TO02 | Construct T‑Hangars

Closes 11/3/2026Opened 10/16/2026

Delta Airport Consultants·Virginia

61% match

COMING SOON - Wise, VA - Lonesome Pine Airport - Construct SRE Building (23052)

Rolling / TBD closeOpened 10/22/2026

City of Charlotte·North Carolina

61% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Massachusetts Port Authority (Massport)·Massachusetts

61% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

City of Charlotte·North Carolina

61% match

FBO Apron Expansion & Rehab

Rolling / TBD closeOpened 10/13/2026

Delta Airport Consultants·Virginia

61% match

COMING SOON - Winchester, VA - Winchester Regional Airport - Northside Site Preparation (25023)

Rolling / TBD closeOpened 6/1/2026

U.S. Department Of Defense·Utah

61% match

F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah

Closes 11/12/2026Opened 10/21/2026

Delaware Coastal Airport·Delaware

61% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026