Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Water and Wastewater
  5. ›18” West Side Transmission Main Extensions

City of Highfill·Arkansas

18” West Side Transmission Main Extensions

Closes 5/19/2026$800k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Highfill, Arkansas is soliciting bids to install 18‑inch water transmission mains, valves, hydrants, and all necessary appurtenances on the west side of town (Lines 1, 2 & 3). The work will be performed according to the plans and specifications available for download from the designated websites. Bids must be submitted by May 19, 2026, and the project is expected to last approximately 540 days once awarded. • Install new 18‑inch water mains, including valves, hydrants, and related appurtenances. • Follow detailed construction drawings and specifications obtainable online. • Project duration estimated at 540 days; contractor responsible for complete installation. • Bids submitted to Highfill City Hall; opening on May 19, 2026 at 2 p.m. local time. • No pre‑bid meeting or site‑visit information provided; interested parties must register on the designated website to access documents.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Holland(Mayor)

Key dates

Opened
4/12/2026
Closes
5/19/2026
Duration
540 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Refcode: #590664

Budget estimate

$800,000 – $1,500,000

Based on typical municipal water main projects of this size (18‑inch mains, multiple lines, valves, hydrants) and a 540‑day construction period, the contract value is likely in the low‑to‑mid‑million‑dollar range. Assuming material costs for 18‑inch ductile iron pipe, labor, excavation, and ancillary work, a reasonable estimate would be between $0.8 million and $1.5 million. Factors influencing the final amount include exact line lengths, site conditions, and any required traffic control or utility relocation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 62%

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Springfield·Illinois

61% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Tontitown·Arkansas

61% match

Fletcher Avenue Extension – West

Closes 12/1/2026Opened 10/25/2026

City of Des Moines - Iowa·Iowa

60% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Charlotte·North Carolina

60% match

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

City of Muskogee·Oklahoma

60% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

Florida Governmental Utility Authority·Florida

60% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

County of San Luis Obispo·California

59% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Charlotte·North Carolina

59% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

Massachusetts Town of Westborough·Massachusetts

58% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Georgia Rockdale County Board of Commissioners·Georgia

58% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026

City of Shawnee·Kansas

58% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

City of Orangeburg·South Carolina

58% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026

Illinois THA - Toll Highway Authority·Illinois

58% match

ChangeOrderNotice I-21-4744Elgin O'Hare Western Access I-294 to 1-90 East of I-294 at Grand Ave CMS

Closes 11/3/2026Opened 10/13/2026

Town of Upton·Wyoming

58% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Charlotte·North Carolina

58% match

Fiscal Year 2026 Street Main Extensions Contract 2

Rolling / TBD closeOpened 1/15/2026

City of Seattle·Washington

58% match

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026Opened 10/14/2026

City of Riverside·California

58% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Murfreesboro·Tennessee

58% match

Cherry Lane Extension, from east of I-840 to west of I-84 (New Interchange)

Closes 11/3/2026Opened 10/6/2026

Iowa Department of Transportation·Iowa

58% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/27/2026

Toledo Area Regional Transit Authority·Ohio

58% match

Transit Hub Elevator Additions

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Energy·California

58% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

Massachusetts Department of Transportation·Massachusetts

57% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

Hastings Utilities·Nebraska

57% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Western Virginia Water Authority·Virginia

57% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026