The Federal Bureau of Prisons (FBOP) is seeking small business contractors for a project to upgrade the fire detection system at the Federal Detention Center (FDC) in Honolulu, Hawaii. The project includes the installation of a new addressable, automatic, and manual fire alarm system, a voice evacuation system, and a smoke control system. The system must meet Level 3 Pathway Survivability requirements and include features such as remote booster power supply units, voice evacuation amplifiers, and firefighter's two-way communication phones. The contractor will be responsible for providing detailed shop drawings, cutting and patching ceilings and walls, and installing new conduit and wiring in existing ceiling spaces. The project is estimated to take 161 calendar days to complete, and the FBOP is seeking contractors who can provide the necessary equipment, labor, materials, and incidentals to complete the project.
Key features of the project include:
• New fire alarm system with voice evacuation and smoke control
• Level 3 Pathway Survivability requirements
• Remote booster power supply units and voice evacuation amplifiers
• Firefighter's two-way communication phones
• Installation of new conduit and wiring in existing ceiling spaces
• Cutting and patching of ceilings and walls
• Provide detailed shop drawings and updated CAD files upon completion
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.